Mold · Clwyd

Extensions over a garage in Mold

We cover Mold and the rest of Clwyd for extensions over a garage. Start with a free site visit and a plain-English view of what your house and plot can take.

Before you start in Mold, here's what applies.

Postcode districts
CH7
County / area
Clwyd, Wales
Price region
Wales
Guide price
£29,000–£42,000 (£1,610–£2,350 per m²)
Approval route
Can be permitted development in Wales if it is 10.5 m from the side boundary, set back 1 m from the front and doesn't widen the house by more than half; otherwise planning permission.
Nearest towns
Buckley (2.4 miles), Deeside (4.9 miles), Hawarden (4.9 miles)
Distance to Wrexham
about 10.4 miles
First visit
Free, no obligation

About an extension over a garage

An extension over a garage is a new first-floor room built on top of an existing attached garage, usually a bedroom, en-suite or study. It uses a footprint you already have, so it adds floor space without taking any garden. The garage walls and foundations often need strengthening or replacing to carry the new floor.

Mold sits about 10.4 miles from Wrexham. Closer to home, Buckley is 2.4 miles away and Deeside 4.9 miles.

What it costs in Mold

Most of the cost of an extension over a garage is set by its size and specification. For Mold and the rest of Wales, our guide is £1,610–£2,350 per m² including VAT, so about £29,000–£42,000 for 3 m × 6 m of new first-floor space (18 m²). Keep a contingency of around 10% for things nobody can see until the ground is opened up.

SpecPer m²3 m × 6 m of new first-floor space (18 m²)
Essential£1,480–£2,160 per m²£26,500–£39,000
Standard£1,610–£2,350 per m²£29,000–£42,000
Premium£1,930–£2,820 per m²£35,000–£50,500

Planning and building regulations in Mold

In Wales, building over a side garage can be permitted development if the result is at least 10.5 m from the boundary opposite the side wall, set back at least 1 m from the front of the house and does not widen the house by more than 50%. Garages close to the boundary usually fail these tests, so a householder application costing £585 is often needed.

Approval in Wales: Householder planning application: £585. Councils normally decide householder applications within 8 weeks.

Building regulations: Building regulations approval under the Welsh Approved Documents, which differ from England's in places (notably energy efficiency).

Design points for Mold homes

Floor levels and headroom

Garage floors are often lower than the house, and the new first floor may not line up with the existing landing. We set the floor level to avoid awkward steps upstairs, while keeping enough headroom in the garage below for a car or storage.

Checking the garage foundations

Garages are often built on shallow strip footings sized for a single-storey wall and a light roof. A trial hole shows their depth and condition, and the engineer decides whether they can carry two storeys or need underpinning or new foundations inside the garage.

How we'd run your project

  1. Understand the brief

    At your home in Mold we agree what you need: bedroom count, bathroom, kitchen space, and how much garden you want to keep.

  2. Drawings and permission

    Our designers produce plans and elevations, then we take care of planning or permitted development checks with the council covering Mold.

  3. Technical design

    We prepare the building regulations drawings, structural calculations and specification so the build price can be fixed.

  4. Build

    Foundations, walls, floor, roof, windows, then first and second fix. We break through into the house as late as we can.

Questions about extensions over a garage in Mold

Who handles building regulations for a project in Mold?

We handle it as part of the project. What's needed in Wales: building regulations approval under the Welsh Approved Documents, which differ from England's in places (notably energy efficiency). We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.

Which postcodes do you cover around Mold?

We cover Mold (CH7) and nearby places including Buckley, Deeside and Hawarden, plus the rest of Clwyd. The first site visit is free.

How long does an extension over a garage take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils normally decide householder applications within 8 weeks), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Can I add an en-suite above the garage?

Yes, and it is a common choice for a main bedroom. The en-suite needs an extract fan under Part F, a route for the soil pipe down to the drains and enough fall for the waste, which can be harder over a garage. We plan the pipe route through the garage or an outside wall early.

Can my garage take a room on top?

Sometimes, but it needs checking. Many garages are built on shallow footings with thin walls, designed only for a single storey. We dig a trial hole and inspect the walls, and the structural engineer decides whether to reuse them, strengthen them, underpin the footings or build new foundations inside the garage.

Nearby

Other towns near Mold:

Other extensions in Mold