Ballyclare · County Antrim

First-floor extensions in Ballyclare

We cover Ballyclare and the rest of County Antrim for first-floor extensions. Start with a free site visit and a plain-English view of what your house and plot can take.

Quick reference for homeowners in Ballyclare.

Postcode districts
BT39
County / area
County Antrim, Northern Ireland
Price region
Northern Ireland
Guide price
£22,000–£32,000 (£1,580–£2,290 per m²)
Approval route
It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.
Nearest towns
Greenisland (6.1 miles), Jordanstown (6.1 miles), Newtownabbey (7.3 miles)
Distance to Belfast
about 11.1 miles
First visit
Free, no obligation

About a first-floor extension

A first-floor extension is a new upstairs room built on top of an existing single-storey part of your house, such as a rear kitchen extension, a utility or a side annexe. It adds a bedroom, bathroom or study without enlarging the footprint. Whether it works depends mainly on whether the walls and foundations below can carry the extra load.

Around Ballyclare we also work in Greenisland, Jordanstown and Newtownabbey, and across the rest of County Antrim. Postcode district in and near Ballyclare: BT39.

What it costs in Ballyclare

Guide prices for first-floor extensions in Northern Ireland are around £1,580–£2,290 per m² of new floor space, including VAT. For a typical project with 4 m × 3.5 m of new first-floor space (14 m²), that's roughly £22,000–£32,000. Professional fees for drawings and the structural engineer are listed separately on our prices page.

SpecPer m²4 m × 3.5 m of new first-floor space (14 m²)
Essential£1,460–£2,100 per m²£20,500–£29,500
Standard£1,580–£2,290 per m²£22,000–£32,000
Premium£1,900–£2,750 per m²£26,500–£38,500

Planning and building control in Ballyclare

In Northern Ireland, a first floor over a rear extension can be permitted development if the extension goes no more than 3 m beyond the original rear wall and stays at least 7 m from the rear boundary, with height, materials and roof pitch conditions. Over a side extension, or beyond these limits, a planning application costs £347 per dwelling.

Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.

Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.

Design points for Ballyclare homes

Can the existing structure take it?

Many single-storey extensions were built with foundations, walls and lintels sized for one storey. We find out what is there with trial holes and, where available, the original building control drawings. The engineer then decides whether to reuse, strengthen or rebuild parts of the structure.

Escape and fire safety

A new first-floor bedroom needs an escape window with a clear opening of at least 0.33 m², at least 450 mm wide and 450 mm high, with the bottom no more than 1,100 mm above the floor, unless there is a protected route to the stairs.

How we'd run your project

  1. Free site visit

    We visit your home in Ballyclare, look at the structure, access and boundaries, and talk through what you want the new rooms to do.

  2. Plans, then approval

    Measured survey, design, then the right approval route for your house. We explain each step before we take it.

  3. Structure and building control

    A structural engineer sizes the foundations and steels, and we get building regulations approval before work starts.

  4. Finish and certify

    Second fix, plastering and making good, then building control's final inspection and the completion paperwork.

Questions about first-floor extensions in Ballyclare

Who handles building control for a project in Ballyclare?

We handle it as part of the project. What's needed in Northern Ireland: building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.

Do I need planning permission for a first-floor extension in Ballyclare?

Ballyclare is in Northern Ireland. It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.

How long does a first-floor extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils aim to decide local applications within an average of 15 weeks; many take longer), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Can I build on top of my existing single-storey extension?

Often yes, but only after the structure has been checked. Foundations, walls and lintels built for one storey may not carry two. We dig trial holes, look for the original building control approval and ask the structural engineer to confirm what can stay, what needs strengthening and what must be rebuilt.

What happens to the room below while the first floor is built?

The old roof is removed, so the room below is exposed for a short period. We fit temporary weather protection, plan the work so the roof comes off only when the new structure is ready, and agree with you which rooms will be out of use and for roughly how long.

Nearby

Other towns near Ballyclare:

Other extensions in Ballyclare

All two-storey extension services in Ballyclare · First-floor extensions across County Antrim

The quickest next step is a visit. We'll look at your house in Ballyclare and give you an honest view of the options.