Newtownabbey · County Antrim

First-floor extensions in Newtownabbey

We plan and build first-floor extensions for homeowners in Newtownabbey and nearby. Every project starts with a free visit and a design stage priced in writing before any work begins.

Quick reference for homeowners in Newtownabbey.

Postcode districts
BT36
County / area
County Antrim, Northern Ireland
Price region
Northern Ireland
Guide price
£22,000–£32,000 (£1,580–£2,290 per m²)
Approval route
It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.
Nearest towns
Jordanstown (1.7 miles), Greenisland (3.1 miles), Holywood (3.7 miles)
Distance to Belfast
about 4.4 miles
First visit
Free, no obligation

About a first-floor extension

A first-floor extension is a new upstairs room built on top of an existing single-storey part of your house, such as a rear kitchen extension, a utility or a side annexe. It adds a bedroom, bathroom or study without enlarging the footprint. Whether it works depends mainly on whether the walls and foundations below can carry the extra load.

We cover Newtownabbey (BT36) and the places around it, including Jordanstown (1.7 miles), Greenisland (3.1 miles) and Holywood.

What it costs in Newtownabbey

Expect a first-floor extension in Newtownabbey to land somewhere around £22,000–£32,000 for 4 m × 3.5 m of new first-floor space (14 m²). Our Northern Ireland guide rate is £1,580–£2,290 per m², including VAT. Kitchens, bathroom fittings and flooring are priced separately so you can compare like with like.

SpecPer m²4 m × 3.5 m of new first-floor space (14 m²)
Essential£1,460–£2,100 per m²£20,500–£29,500
Standard£1,580–£2,290 per m²£22,000–£32,000
Premium£1,900–£2,750 per m²£26,500–£38,500

Planning and building control in Newtownabbey

In Northern Ireland, a first floor over a rear extension can be permitted development if the extension goes no more than 3 m beyond the original rear wall and stays at least 7 m from the rear boundary, with height, materials and roof pitch conditions. Over a side extension, or beyond these limits, a planning application costs £347 per dwelling.

Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.

Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.

Design points for Newtownabbey homes

Replacing the flat roof

The existing roof usually comes off and is replaced by a new first-floor structure. The room below is exposed for a short time, so we plan temporary weatherproofing and sequence the work to keep the kitchen or living room usable for as long as possible.

Can the existing structure take it?

Many single-storey extensions were built with foundations, walls and lintels sized for one storey. We find out what is there with trial holes and, where available, the original building control drawings. The engineer then decides whether to reuse, strengthen or rebuild parts of the structure.

How we'd run your project

  1. Measure and listen

    A visit to Newtownabbey to understand how you live in the house now and what the extra rooms need to do, plus a first look at the structure.

  2. Choose the approval route

    Some designs fit permitted development, most need a householder application. We decide which applies in Northern Ireland before drawing in detail.

  3. Engineer it

    Foundations sized for two floors, steels for any openings, and building control approval, all before anyone starts on site.

  4. Build and hand over

    We manage the build from groundworks to decoration-ready finish and hand over with the completion paperwork.

Questions about first-floor extensions in Newtownabbey

How much does a first-floor extension cost in Newtownabbey?

Our guide for Northern Ireland, which covers Newtownabbey, is £1,580–£2,290 per m² including VAT. A typical project with 4 m × 3.5 m of new first-floor space (14 m²) comes to about £22,000–£32,000. Design and approval fees are extra, and we fix the build price in writing once the design is agreed.

Do I need planning permission for a first-floor extension in Newtownabbey?

Newtownabbey is in Northern Ireland. It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.

How long does a first-floor extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils aim to decide local applications within an average of 15 weeks; many take longer), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

What happens to the room below while the first floor is built?

The old roof is removed, so the room below is exposed for a short period. We fit temporary weather protection, plan the work so the roof comes off only when the new structure is ready, and agree with you which rooms will be out of use and for roughly how long.

Can I build on top of my existing single-storey extension?

Often yes, but only after the structure has been checked. Foundations, walls and lintels built for one storey may not carry two. We dig trial holes, look for the original building control approval and ask the structural engineer to confirm what can stay, what needs strengthening and what must be rebuilt.

Nearby

Close to Newtownabbey? We work across the area, including:

Other extensions in Newtownabbey

All two-storey extension services in Newtownabbey · First-floor extensions across County Antrim

Book a free site visit in Newtownabbey and we'll tell you what's possible, what approvals you need and what the design stage would cost.

CallGuide price