Holywood · County Down

First-floor extensions in Holywood

For a first-floor extension in Holywood, the first questions are always the same: how big, which approvals, and what it will cost. This page answers all three for County Down.

Quick reference for homeowners in Holywood.

Postcode districts
BT18
County / area
County Down, Northern Ireland
Price region
Northern Ireland
Guide price
£22,000–£32,000 (£1,580–£2,290 per m²)
Approval route
It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.
Nearest towns
Dundonald (3.4 miles), Newtownabbey (3.7 miles), Jordanstown (4.3 miles)
Distance to Bangor (County Down)
about 6.4 miles
First visit
Free, no obligation

About a first-floor extension

A first-floor extension is a new upstairs room built on top of an existing single-storey part of your house, such as a rear kitchen extension, a utility or a side annexe. It adds a bedroom, bathroom or study without enlarging the footprint. Whether it works depends mainly on whether the walls and foundations below can carry the extra load.

Holywood sits about 6.4 miles from Bangor (County Down). Closer to home, Dundonald is 3.4 miles away and Newtownabbey 3.7 miles.

What it costs in Holywood

Our guide for Northern Ireland is £1,580–£2,290 per m² including VAT. On a project with 4 m × 3.5 m of new first-floor space (14 m²), that puts a first-floor extension in Holywood at roughly £22,000–£32,000. We'll give you a written design-stage price first, then a fixed build price once the drawings are agreed.

SpecPer m²4 m × 3.5 m of new first-floor space (14 m²)
Essential£1,460–£2,100 per m²£20,500–£29,500
Standard£1,580–£2,290 per m²£22,000–£32,000
Premium£1,900–£2,750 per m²£26,500–£38,500

Planning and building control in Holywood

In Northern Ireland, a first floor over a rear extension can be permitted development if the extension goes no more than 3 m beyond the original rear wall and stays at least 7 m from the rear boundary, with height, materials and roof pitch conditions. Over a side extension, or beyond these limits, a planning application costs £347 per dwelling.

Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.

Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.

Design points for Holywood homes

Can the existing structure take it?

Many single-storey extensions were built with foundations, walls and lintels sized for one storey. We find out what is there with trial holes and, where available, the original building control drawings. The engineer then decides whether to reuse, strengthen or rebuild parts of the structure.

Tying into the house

The new floor and walls must line up with the existing first floor, often through a new opening in the rear wall above the old one. Floor levels, the position of upstairs windows and the existing roof all affect where the opening can go, so we survey both floors carefully.

How we'd run your project

  1. Measure and listen

    A visit to Holywood to understand how you live in the house now and what the extra rooms need to do, plus a first look at the structure.

  2. Drawings and permission

    Our designers produce plans and elevations, then we take care of planning or permitted development checks with the council covering Holywood.

  3. Technical design

    We prepare the building regulations drawings, structural calculations and specification so the build price can be fixed.

  4. Build

    Foundations, walls, floor, roof, windows, then first and second fix. We break through into the house as late as we can.

Questions about first-floor extensions in Holywood

How long does a first-floor extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils aim to decide local applications within an average of 15 weeks; many take longer), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Who handles building control for a project in Holywood?

We handle it as part of the project. What's needed in Northern Ireland: building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.

Do I need planning permission for a first-floor extension in Holywood?

Holywood is in Northern Ireland. It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.

Can I build on top of my existing single-storey extension?

Often yes, but only after the structure has been checked. Foundations, walls and lintels built for one storey may not carry two. We dig trial holes, look for the original building control approval and ask the structural engineer to confirm what can stay, what needs strengthening and what must be rebuilt.

What happens to the room below while the first floor is built?

The old roof is removed, so the room below is exposed for a short period. We fit temporary weather protection, plan the work so the roof comes off only when the new structure is ready, and agree with you which rooms will be out of use and for roughly how long.

Nearby

Close to Holywood? We work across the area, including:

Other extensions in Holywood

All two-storey extension services in Holywood · First-floor extensions across County Down

Book a free site visit in Holywood and we'll tell you what's possible, what approvals you need and what the design stage would cost.