Looking for first-floor extensions in County Down? We handle the full job: survey, design, approvals, structural design and build.

County Down at a glance

Nation
Northern Ireland
Price region
Northern Ireland
Postcode areas
BT
Towns covered
15 listed below, plus surrounding villages
Approval route
It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.
Site visits
Free, no obligation

What a first-floor extension involves

A first-floor extension is a new upstairs room built on top of an existing single-storey part of your house, such as a rear kitchen extension, a utility or a side annexe. It adds a bedroom, bathroom or study without enlarging the footprint. Whether it works depends mainly on whether the walls and foundations below can carry the extra load.

Towns in County Down include Bangor (County Down) (BT19), Newtownards (BT22), Newry (BT35), Banbridge (BT32), Dundonald (BT16) and Holywood (BT18). If yours isn't listed, we still cover it.

Guide price in Northern Ireland

Most of the cost of a first-floor extension is set by its size and specification. For County Down and the rest of Northern Ireland, our guide is £1,580–£2,290 per m² including VAT, so about £22,000–£32,000 for 4 m × 3.5 m of new first-floor space (14 m²). Design fees, structural calculations and approval fees are separate and listed on our prices page.

SpecPer m²Typical project
Essential£1,460–£2,100 per m²£20,500–£29,500
Standard£1,580–£2,290 per m²£22,000–£32,000
Premium£1,900–£2,750 per m²£26,500–£38,500

Rules in Northern Ireland

In Northern Ireland, a first floor over a rear extension can be permitted development if the extension goes no more than 3 m beyond the original rear wall and stays at least 7 m from the rear boundary, with height, materials and roof pitch conditions. Over a side extension, or beyond these limits, a planning application costs £347 per dwelling.

Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.

Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.

There is no Party Wall Act in Northern Ireland. Shared walls and boundaries are a matter of title and common law, so we agree access and record conditions with neighbours before work starts.

Getting the design right

Escape and fire safety

A new first-floor bedroom needs an escape window with a clear opening of at least 0.33 m², at least 450 mm wide and 450 mm high, with the bottom no more than 1,100 mm above the floor, unless there is a protected route to the stairs.

Replacing the flat roof

The existing roof usually comes off and is replaced by a new first-floor structure. The room below is exposed for a short time, so we plan temporary weatherproofing and sequence the work to keep the kitchen or living room usable for as long as possible.

How we work in County Down

  1. Start at your house

    We come to your home in County Down, measure up, check the ground floor walls and roof structure, and note anything near the boundaries.

  2. Drawings, then consent

    We draw the scheme, check it against the rules in Northern Ireland, and take it through the right consent with the council.

  3. Structure and building control

    A structural engineer sizes the foundations and steels, and we get building regulations approval before work starts.

  4. Build and hand over

    We manage the build from groundworks to decoration-ready finish and hand over with the completion paperwork.

Towns we cover in County Down

First-floor extensions in County Down: questions

How much does a first-floor extension cost in County Down?

In Northern Ireland our guide is £1,580–£2,290 per m² including VAT, so about £22,000–£32,000 for 4 m × 3.5 m of new first-floor space (14 m²). Essential and Premium specs move that by roughly 8% down or 20% up.

What happens to the room below while the first floor is built?

The old roof is removed, so the room below is exposed for a short period. We fit temporary weather protection, plan the work so the roof comes off only when the new structure is ready, and agree with you which rooms will be out of use and for roughly how long.

Can I build on top of my existing single-storey extension?

Often yes, but only after the structure has been checked. Foundations, walls and lintels built for one storey may not carry two. We dig trial holes, look for the original building control approval and ask the structural engineer to confirm what can stay, what needs strengthening and what must be rebuilt.

Will I need planning permission in County Down?

County Down is in Northern Ireland. It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.

Neighbouring areas

All extension services in County Down · About first-floor extensions

Ready to see what a second storey could do for your home?

Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.

CallGuide price