County Tyrone · Northern Ireland

First-floor extensions in County Tyrone

Our first-floor extensions service covers the whole of County Tyrone. Choose your town below or book a free visit straight away.

County Tyrone at a glance

Nation
Northern Ireland
Price region
Northern Ireland
Postcode areas
BT
Towns covered
8 listed below, plus surrounding villages
Approval route
It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.
Site visits
Free, no obligation

What a first-floor extension involves

A first-floor extension suits you if your house already has a single-storey extension and you need more space upstairs. You get a structural check of the existing walls and foundations, a design that ties the new floor into the house, the approvals your nation needs, building regulations approval and the build, managed by us and carried out by vetted teams working under S&K.

County Tyrone towns we list: Omagh (BT78), Strabane (BT82), Dungannon (BT69), Cookstown (BT80), Coalisland (BT71) and Dromore (County Tyrone) (BT78). Every other address in County Tyrone is covered as well.

Guide price in Northern Ireland

A guide price for County Tyrone: around £22,000–£32,000 for 4 m × 3.5 m of new first-floor space (14 m²). That works out at £1,580–£2,290 per m² of new floor space, including VAT at 20%. Steelwork for wide openings is the item most likely to move the figure; we'll know once the engineer has designed it.

SpecPer m²Typical project
Essential£1,460–£2,100 per m²£20,500–£29,500
Standard£1,580–£2,290 per m²£22,000–£32,000
Premium£1,900–£2,750 per m²£26,500–£38,500

Rules in Northern Ireland

In Northern Ireland, a first floor over a rear extension can be permitted development if the extension goes no more than 3 m beyond the original rear wall and stays at least 7 m from the rear boundary, with height, materials and roof pitch conditions. Over a side extension, or beyond these limits, a planning application costs £347 per dwelling.

Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.

Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.

There is no Party Wall Act in Northern Ireland. Shared walls and boundaries are a matter of title and common law, so we agree access and record conditions with neighbours before work starts.

Getting the design right

Can the existing structure take it?

Many single-storey extensions were built with foundations, walls and lintels sized for one storey. We find out what is there with trial holes and, where available, the original building control drawings. The engineer then decides whether to reuse, strengthen or rebuild parts of the structure.

Replacing the flat roof

The existing roof usually comes off and is replaced by a new first-floor structure. The room below is exposed for a short time, so we plan temporary weatherproofing and sequence the work to keep the kitchen or living room usable for as long as possible.

How we work in County Tyrone

  1. Understand the brief

    At your home in County Tyrone we agree what you need: bedroom count, bathroom, kitchen space, and how much garden you want to keep.

  2. Drawings and permission

    Our designers produce plans and elevations, then we take care of planning or permitted development checks with the council covering County Tyrone.

  3. Structure and building control

    A structural engineer sizes the foundations and steels, and we get building regulations approval before work starts.

  4. Finish and certify

    Second fix, plastering and making good, then building control's final inspection and the completion paperwork.

Towns we cover in County Tyrone

First-floor extensions in County Tyrone: questions

How much does a first-floor extension cost in County Tyrone?

In Northern Ireland our guide is £1,580–£2,290 per m² including VAT, so about £22,000–£32,000 for 4 m × 3.5 m of new first-floor space (14 m²). Essential and Premium specs move that by roughly 8% down or 20% up.

What happens to the room below while the first floor is built?

The old roof is removed, so the room below is exposed for a short period. We fit temporary weather protection, plan the work so the roof comes off only when the new structure is ready, and agree with you which rooms will be out of use and for roughly how long.

Can I build on top of my existing single-storey extension?

Often yes, but only after the structure has been checked. Foundations, walls and lintels built for one storey may not carry two. We dig trial holes, look for the original building control approval and ask the structural engineer to confirm what can stay, what needs strengthening and what must be rebuilt.

Will I need planning permission in County Tyrone?

County Tyrone is in Northern Ireland. It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.

Neighbouring areas

All extension services in County Tyrone · About first-floor extensions

Ready to see what a second storey could do for your home?

Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.

CallGuide price