County Armagh · Northern Ireland

First-floor extensions in County Armagh

If you're in County Armagh and weighing up a first-floor extension, start here: guide costs for Northern Ireland, the approvals you'll need and how we work.

County Armagh at a glance

Nation
Northern Ireland
Price region
Northern Ireland
Postcode areas
BT
Towns covered
8 listed below, plus surrounding villages
Approval route
It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.
Site visits
Free, no obligation

What a first-floor extension involves

A first-floor extension suits you if your house already has a single-storey extension and you need more space upstairs. You get a structural check of the existing walls and foundations, a design that ties the new floor into the house, the approvals your nation needs, building regulations approval and the build, managed by us and carried out by vetted teams working under S&K.

Towns in County Armagh include Craigavon (BT64), Portadown (BT62), Armagh (BT61), Moira (BT67), Keady (BT60) and Tandragee (BT63). If yours isn't listed, we still cover it.

Guide price in Northern Ireland

A guide price for County Armagh: around £22,000–£32,000 for 4 m × 3.5 m of new first-floor space (14 m²). That works out at £1,580–£2,290 per m² of new floor space, including VAT at 20%. Steelwork for wide openings is the item most likely to move the figure; we'll know once the engineer has designed it.

SpecPer m²Typical project
Essential£1,460–£2,100 per m²£20,500–£29,500
Standard£1,580–£2,290 per m²£22,000–£32,000
Premium£1,900–£2,750 per m²£26,500–£38,500

Rules in Northern Ireland

In Northern Ireland, a first floor over a rear extension can be permitted development if the extension goes no more than 3 m beyond the original rear wall and stays at least 7 m from the rear boundary, with height, materials and roof pitch conditions. Over a side extension, or beyond these limits, a planning application costs £347 per dwelling.

Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.

Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.

There is no Party Wall Act in Northern Ireland. Shared walls and boundaries are a matter of title and common law, so we agree access and record conditions with neighbours before work starts.

Getting the design right

Tying into the house

The new floor and walls must line up with the existing first floor, often through a new opening in the rear wall above the old one. Floor levels, the position of upstairs windows and the existing roof all affect where the opening can go, so we survey both floors carefully.

Escape and fire safety

A new first-floor bedroom needs an escape window with a clear opening of at least 0.33 m², at least 450 mm wide and 450 mm high, with the bottom no more than 1,100 mm above the floor, unless there is a protected route to the stairs.

How we work in County Armagh

  1. Understand the brief

    At your home in County Armagh we agree what you need: bedroom count, bathroom, kitchen space, and how much garden you want to keep.

  2. Choose the approval route

    Some designs fit permitted development, most need a householder application. We decide which applies in Northern Ireland before drawing in detail.

  3. Detail and price

    Construction drawings, engineer's calculations and building control sign-off, then a written fixed price for the build.

  4. Build it

    The new structure goes up first, then we open into the house, finish inside and get the completion certificate.

Towns we cover in County Armagh

First-floor extensions in County Armagh: questions

How much does a first-floor extension cost in County Armagh?

In Northern Ireland our guide is £1,580–£2,290 per m² including VAT, so about £22,000–£32,000 for 4 m × 3.5 m of new first-floor space (14 m²). Essential and Premium specs move that by roughly 8% down or 20% up.

Can I build on top of my existing single-storey extension?

Often yes, but only after the structure has been checked. Foundations, walls and lintels built for one storey may not carry two. We dig trial holes, look for the original building control approval and ask the structural engineer to confirm what can stay, what needs strengthening and what must be rebuilt.

What happens to the room below while the first floor is built?

The old roof is removed, so the room below is exposed for a short period. We fit temporary weather protection, plan the work so the roof comes off only when the new structure is ready, and agree with you which rooms will be out of use and for roughly how long.

Will I need planning permission in County Armagh?

County Armagh is in Northern Ireland. It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.

Neighbouring areas

All extension services in County Armagh · About first-floor extensions

Ready to see what a second storey could do for your home?

Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.

CallGuide price