First-floor extensions in Keady
We plan and build first-floor extensions for homeowners in Keady and nearby. Every project starts with a free visit and a design stage priced in writing before any work begins.
Quick reference for homeowners in Keady.
- Postcode districts
- BT60
- County / area
- County Armagh, Northern Ireland
- Price region
- Northern Ireland
- Guide price
- £22,000–£32,000 (£1,580–£2,290 per m²)
- Approval route
- It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.
- Nearest towns
- Armagh (7 miles), Tandragee (13.6 miles), Newry (15.5 miles)
- Distance to Craigavon
- about 18.6 miles
- First visit
- Free, no obligation
About a first-floor extension
A first-floor extension is a new upstairs room built on top of an existing single-storey part of your house, such as a rear kitchen extension, a utility or a side annexe. It adds a bedroom, bathroom or study without enlarging the footprint. Whether it works depends mainly on whether the walls and foundations below can carry the extra load.
Around Keady we also work in Armagh, Tandragee and Newry, and across the rest of County Armagh. Postcode district in and near Keady: BT60.
What it costs in Keady
Our guide for Northern Ireland is £1,580–£2,290 per m² including VAT. On a project with 4 m × 3.5 m of new first-floor space (14 m²), that puts a first-floor extension in Keady at roughly £22,000–£32,000. Keep a contingency of around 10% for things nobody can see until the ground is opened up.
| Spec | Per m² | 4 m × 3.5 m of new first-floor space (14 m²) |
|---|---|---|
| Essential | £1,460–£2,100 per m² | £20,500–£29,500 |
| Standard | £1,580–£2,290 per m² | £22,000–£32,000 |
| Premium | £1,900–£2,750 per m² | £26,500–£38,500 |
Planning and building control in Keady
In Northern Ireland, a first floor over a rear extension can be permitted development if the extension goes no more than 3 m beyond the original rear wall and stays at least 7 m from the rear boundary, with height, materials and roof pitch conditions. Over a side extension, or beyond these limits, a planning application costs £347 per dwelling.
Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.
Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.
Design points for Keady homes
Tying into the house
The new floor and walls must line up with the existing first floor, often through a new opening in the rear wall above the old one. Floor levels, the position of upstairs windows and the existing roof all affect where the opening can go, so we survey both floors carefully.
Escape and fire safety
A new first-floor bedroom needs an escape window with a clear opening of at least 0.33 m², at least 450 mm wide and 450 mm high, with the bottom no more than 1,100 mm above the floor, unless there is a protected route to the stairs.
How we'd run your project
Start at your house
We come to your home in Keady, measure up, check the ground floor walls and roof structure, and note anything near the boundaries.
Drawings, then consent
We draw the scheme, check it against the rules in Northern Ireland, and take it through the right consent with the council.
Engineer it
Foundations sized for two floors, steels for any openings, and building control approval, all before anyone starts on site.
Finish and certify
Second fix, plastering and making good, then building control's final inspection and the completion paperwork.
Questions about first-floor extensions in Keady
Which postcodes do you cover around Keady?
We cover Keady (BT60) and nearby places including Armagh, Tandragee and Newry, plus the rest of County Armagh. The first site visit is free.
How long does a first-floor extension take?
Allow 4 to 8 weeks for survey and design, then the approval period (councils aim to decide local applications within an average of 15 weeks; many take longer), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.
Who handles building control for a project in Keady?
We handle it as part of the project. What's needed in Northern Ireland: building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.
Can I build on top of my existing single-storey extension?
Often yes, but only after the structure has been checked. Foundations, walls and lintels built for one storey may not carry two. We dig trial holes, look for the original building control approval and ask the structural engineer to confirm what can stay, what needs strengthening and what must be rebuilt.
What happens to the room below while the first floor is built?
The old roof is removed, so the room below is exposed for a short period. We fit temporary weather protection, plan the work so the roof comes off only when the new structure is ready, and agree with you which rooms will be out of use and for roughly how long.
Nearby
Other towns near Keady:
Other extensions in Keady
- Rear
- Side
- Wraparound
- Part two-storey
- Over a garage
- Semi-detached
- Detached
- Kitchen and bedrooms
- Bedroom and en-suite
All two-storey extension services in Keady · First-floor extensions across County Armagh
The quickest next step is a visit. We'll look at your house in Keady and give you an honest view of the options.