Keady · County Armagh

Kitchen extensions with bedrooms above in Keady

If you live in Keady and need more room without moving, a kitchen extension with bedrooms above is worth a serious look. We handle the drawings, approvals, structure and build.

The basics for Keady at a glance.

Postcode districts
BT60
County / area
County Armagh, Northern Ireland
Price region
Northern Ireland
Guide price
£49,500–£66,500 (£1,760–£2,380 per m²), kitchen units and worktops priced separately
Approval route
It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.
Nearest towns
Armagh (7 miles), Tandragee (13.6 miles), Newry (15.5 miles)
Distance to Craigavon
about 18.6 miles
First visit
Free, no obligation

About a kitchen extension with bedrooms above

This service suits you if your kitchen is too small and you also need another bedroom. Building both floors at once costs less than a single-storey kitchen extension now and a first floor later. You get a layout that works for cooking, eating and the garden, a bedroom plan that works upstairs, the approvals your nation needs and the build, carried out by vetted teams working under S&K. Kitchen units are priced separately.

We cover Keady (BT60) and the places around it, including Armagh (7.0 miles), Tandragee (13.6 miles) and Newry.

What it costs in Keady

Guide prices for kitchen extensions with bedrooms above in Northern Ireland are around £1,760–£2,380 per m² of new floor space, including VAT. For a typical project with a 4 m × 3.5 m footprint on two floors (28 m² of new floor space), that's roughly £49,500–£66,500 (kitchen units and worktops priced separately). Keep a contingency of around 10% for things nobody can see until the ground is opened up.

SpecPer m²A 4 m × 3.5 m footprint on two floors (28 m² of new floor space)
Essential£1,620–£2,190 per m²£45,500–£61,000
Standard£1,760–£2,380 per m²£49,500–£66,500
Premium£2,110–£2,850 per m²£59,000–£80,000

Planning and building control in Keady

In Northern Ireland, a kitchen extension with bedrooms above can be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary, with height, materials and roof pitch conditions. Otherwise a planning application costs £347 per dwelling, and building control approval from the council is needed.

Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.

Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.

Design points for Keady homes

Bedrooms over a kitchen

Bedrooms above need an escape window or a protected route to the stairs, plus good sound insulation from the kitchen below. We position the stairs, landing and bedroom doors so the new rooms connect naturally to the existing first floor.

Steel beams and the open-plan opening

Removing the old rear wall to make one large room means a steel beam, sometimes several, to carry the first floor and roof. The engineer sizes the steel and its supports, and we decide early whether you want a flush ceiling with the beam hidden or a downstand, as this affects ceiling heights.

How we'd run your project

  1. Free site visit

    We visit your home in Keady, look at the structure, access and boundaries, and talk through what you want the new rooms to do.

  2. Drawings, then consent

    We draw the scheme, check it against the rules in Northern Ireland, and take it through the right consent with the council.

  3. Detail and price

    Construction drawings, engineer's calculations and building control sign-off, then a written fixed price for the build.

  4. Build and hand over

    We manage the build from groundworks to decoration-ready finish and hand over with the completion paperwork.

Questions about kitchen extensions with bedrooms above in Keady

Do I need planning permission for a kitchen extension with bedrooms above in Keady?

Keady is in Northern Ireland. It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.

How long does a kitchen extension with bedrooms above take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils aim to decide local applications within an average of 15 weeks; many take longer), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Which postcodes do you cover around Keady?

We cover Keady (BT60) and nearby places including Armagh, Tandragee and Newry, plus the rest of County Armagh. The first site visit is free.

Can I keep using my kitchen during the build?

For part of it. The new structure can be built while your existing kitchen stays in use, but when the rear wall is opened and the new kitchen is fitted there will be several weeks without one. We plan when this happens and help you set up a temporary kitchen elsewhere in the house.

Is it cheaper to build a kitchen extension and bedrooms at the same time?

Yes, in most cases. Building both floors at once means one set of foundations, one roof, one scaffold and one set of approvals. Adding a first floor later means removing the original roof, possibly strengthening the foundations and disrupting the kitchen again. If you think you will need the bedroom, build it now.

Nearby

Other towns near Keady:

Other extensions in Keady

All two-storey extension services in Keady · Kitchen extensions with bedrooms above across County Armagh

Ready to talk it through? Call us or send the form and we'll arrange a visit to your home in Keady.