Keady · County Armagh

Part single, part two-storey extensions in Keady

We cover Keady and the rest of County Armagh for part single, part two-storey extensions. Start with a free site visit and a plain-English view of what your house and plot can take.

Before you start in Keady, here's what applies.

Postcode districts
BT60
County / area
County Armagh, Northern Ireland
Price region
Northern Ireland
Guide price
£63,500–£87,000 (£1,760–£2,420 per m²)
Approval route
It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.
Nearest towns
Armagh (7 miles), Tandragee (13.6 miles), Newry (15.5 miles)
Distance to Craigavon
about 18.6 miles
First visit
Free, no obligation

About a part single, part two-storey extension

A part single, part two-storey extension is an extension where the ground floor is wider or deeper than the floor above, so only part of it rises to two storeys. It usually gives a large kitchen or living area with roof lights below and one bedroom or bathroom above. It is often a good way to add space while limiting the effect on neighbours.

Around Keady we also work in Armagh, Tandragee and Newry, and across the rest of County Armagh. Postcode district in and near Keady: BT60.

What it costs in Keady

Expect a part single, part two-storey extension in Keady to land somewhere around £63,500–£87,000 for a 6 m × 4 m ground floor and a first floor over half of it (36 m² in total). Our Northern Ireland guide rate is £1,760–£2,420 per m², including VAT. The fastest way to a firmer number is a free site visit, after which we price the design stage in writing.

SpecPer m²A 6 m × 4 m ground floor and a first floor over half of it (36 m² in total)
Essential£1,620–£2,230 per m²£58,500–£80,000
Standard£1,760–£2,420 per m²£63,500–£87,000
Premium£2,110–£2,900 per m²£76,000–£104,500

Planning and building control in Keady

In Northern Ireland, the extension can be permitted development if it goes no more than 3 m beyond the original rear wall and stays at least 7 m from the rear boundary, with height, materials and roof pitch conditions met. Specified protected areas are excluded. If the design goes further, a planning application costs £347 per dwelling, and building control approval is needed either way.

Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.

Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.

Design points for Keady homes

Structure at the step

The first-floor wall above often sits over the new open-plan space, so it needs a steel beam or frame to carry it. Loads come down at different points than in a full two-storey design, and the engineer sizes the foundations to suit each part.

Where to put the two-storey part

The two-storey section usually works best away from the closest neighbour, with the single-storey part on that boundary side. We test a few positions against neighbours' windows, the upstairs layout and the roof shape before choosing the one to take forward.

How we'd run your project

  1. Free site visit

    We visit your home in Keady, look at the structure, access and boundaries, and talk through what you want the new rooms to do.

  2. Drawings, then consent

    We draw the scheme, check it against the rules in Northern Ireland, and take it through the right consent with the council.

  3. Fixed price in writing

    With approved drawings and calculations, we give you a fixed build price and a programme you can plan around.

  4. Build it

    The new structure goes up first, then we open into the house, finish inside and get the completion certificate.

Questions about part single, part two-storey extensions in Keady

Do I need planning permission for a part single, part two-storey extension in Keady?

Keady is in Northern Ireland. It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.

Who handles building control for a project in Keady?

We handle it as part of the project. What's needed in Northern Ireland: building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.

How long does a part single, part two-storey extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils aim to decide local applications within an average of 15 weeks; many take longer), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Can the single-storey part be deeper than the two-storey part?

With planning permission, yes, and that is often the point of the design: the ground floor projects further into the garden while the first floor stays back from neighbours. Under permitted development, the depth limits for extensions of more than one storey can apply to the whole extension, so we confirm which route applies before drawings are finalised.

Which side should the two-storey part go on?

Usually the side furthest from the nearest neighbour's windows, so the single-storey part sits nearest them and keeps their light. Other factors are where the stairs land upstairs, which room needs the extra space and where drains run. We sketch options at the design stage and explain which is most likely to be approved.

Nearby

Nearby towns we cover for part single, part two-storey extensions:

Other extensions in Keady

All two-storey extension services in Keady · Part single, part two-storey extensions across County Armagh

Want a figure first? Try our guide price tool, then book a free visit to firm it up.

CallGuide price