Donaghadee · County Down

First-floor extensions in Donaghadee

Thinking about a first-floor extension in Donaghadee? We design it, take it through the approvals it needs and build it, with one team responsible from the first visit to the final certificate.

The basics for Donaghadee at a glance.

Postcode districts
BT21
County / area
County Down, Northern Ireland
Price region
Northern Ireland
Guide price
£22,000–£32,000 (£1,580–£2,290 per m²)
Approval route
It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.
Nearest towns
Bangor (County Down) (5.5 miles), Newtownards (7.1 miles), Comber (10.5 miles)
Distance to Bangor (County Down)
about 5.4 miles
First visit
Free, no obligation

About a first-floor extension

A first-floor extension is a new upstairs room built on top of an existing single-storey part of your house, such as a rear kitchen extension, a utility or a side annexe. It adds a bedroom, bathroom or study without enlarging the footprint. Whether it works depends mainly on whether the walls and foundations below can carry the extra load.

We cover postcode district BT21 in and around Donaghadee, along with neighbouring Bangor (County Down), Newtownards and Comber.

What it costs in Donaghadee

A guide price for Donaghadee: around £22,000–£32,000 for 4 m × 3.5 m of new first-floor space (14 m²). That works out at £1,580–£2,290 per m² of new floor space, including VAT at 20%. We'll give you a written design-stage price first, then a fixed build price once the drawings are agreed.

SpecPer m²4 m × 3.5 m of new first-floor space (14 m²)
Essential£1,460–£2,100 per m²£20,500–£29,500
Standard£1,580–£2,290 per m²£22,000–£32,000
Premium£1,900–£2,750 per m²£26,500–£38,500

Planning and building control in Donaghadee

In Northern Ireland, a first floor over a rear extension can be permitted development if the extension goes no more than 3 m beyond the original rear wall and stays at least 7 m from the rear boundary, with height, materials and roof pitch conditions. Over a side extension, or beyond these limits, a planning application costs £347 per dwelling.

Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.

Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.

Design points for Donaghadee homes

Escape and fire safety

A new first-floor bedroom needs an escape window with a clear opening of at least 0.33 m², at least 450 mm wide and 450 mm high, with the bottom no more than 1,100 mm above the floor, unless there is a protected route to the stairs.

Replacing the flat roof

The existing roof usually comes off and is replaced by a new first-floor structure. The room below is exposed for a short time, so we plan temporary weatherproofing and sequence the work to keep the kitchen or living room usable for as long as possible.

How we'd run your project

  1. Look at the house

    We start in Donaghadee with a free visit: measurements, photos, a look at the loft and drains, and a frank chat about budget.

  2. Get it approved

    Once you're happy with the design we submit it to the council for Donaghadee and deal with any questions from the planning officer.

  3. Detail and price

    Construction drawings, engineer's calculations and building control sign-off, then a written fixed price for the build.

  4. Build

    Foundations, walls, floor, roof, windows, then first and second fix. We break through into the house as late as we can.

Questions about first-floor extensions in Donaghadee

Which postcodes do you cover around Donaghadee?

We cover Donaghadee (BT21) and nearby places including Bangor (County Down), Newtownards and Comber, plus the rest of County Down. The first site visit is free.

Do I need planning permission for a first-floor extension in Donaghadee?

Donaghadee is in Northern Ireland. It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.

How long does a first-floor extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils aim to decide local applications within an average of 15 weeks; many take longer), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

What happens to the room below while the first floor is built?

The old roof is removed, so the room below is exposed for a short period. We fit temporary weather protection, plan the work so the roof comes off only when the new structure is ready, and agree with you which rooms will be out of use and for roughly how long.

Can I build on top of my existing single-storey extension?

Often yes, but only after the structure has been checked. Foundations, walls and lintels built for one storey may not carry two. We dig trial holes, look for the original building control approval and ask the structural engineer to confirm what can stay, what needs strengthening and what must be rebuilt.

Nearby

Nearby towns we cover for first-floor extensions:

Other extensions in Donaghadee

All two-storey extension services in Donaghadee · First-floor extensions across County Down

Want a figure first? Try our guide price tool, then book a free visit to firm it up.

CallGuide price