First-floor extensions in Dundonald
We plan and build first-floor extensions for homeowners in Dundonald and nearby. Every project starts with a free visit and a design stage priced in writing before any work begins.
Useful details for planning a first-floor extension in Dundonald.
- Postcode districts
- BT16
- County / area
- County Down, Northern Ireland
- Price region
- Northern Ireland
- Guide price
- £22,000–£32,000 (£1,580–£2,290 per m²)
- Approval route
- It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.
- Nearest towns
- Holywood (3.4 miles), Comber (3.7 miles), Castlereagh (3.7 miles)
- Distance to Bangor (County Down)
- about 7 miles
- First visit
- Free, no obligation
About a first-floor extension
A first-floor extension is a new upstairs room built on top of an existing single-storey part of your house, such as a rear kitchen extension, a utility or a side annexe. It adds a bedroom, bathroom or study without enlarging the footprint. Whether it works depends mainly on whether the walls and foundations below can carry the extra load.
Dundonald sits about 7.0 miles from Bangor (County Down). Closer to home, Holywood is 3.4 miles away and Comber 3.7 miles.
What it costs in Dundonald
A guide price for Dundonald: around £22,000–£32,000 for 4 m × 3.5 m of new first-floor space (14 m²). That works out at £1,580–£2,290 per m² of new floor space, including VAT at 20%. These are guides, not quotes. Ground conditions, steelwork and access can move the figure either way.
| Spec | Per m² | 4 m × 3.5 m of new first-floor space (14 m²) |
|---|---|---|
| Essential | £1,460–£2,100 per m² | £20,500–£29,500 |
| Standard | £1,580–£2,290 per m² | £22,000–£32,000 |
| Premium | £1,900–£2,750 per m² | £26,500–£38,500 |
Planning and building control in Dundonald
In Northern Ireland, a first floor over a rear extension can be permitted development if the extension goes no more than 3 m beyond the original rear wall and stays at least 7 m from the rear boundary, with height, materials and roof pitch conditions. Over a side extension, or beyond these limits, a planning application costs £347 per dwelling.
Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.
Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.
Design points for Dundonald homes
Can the existing structure take it?
Many single-storey extensions were built with foundations, walls and lintels sized for one storey. We find out what is there with trial holes and, where available, the original building control drawings. The engineer then decides whether to reuse, strengthen or rebuild parts of the structure.
Replacing the flat roof
The existing roof usually comes off and is replaced by a new first-floor structure. The room below is exposed for a short time, so we plan temporary weatherproofing and sequence the work to keep the kitchen or living room usable for as long as possible.
How we'd run your project
Start at your house
We come to your home in Dundonald, measure up, check the ground floor walls and roof structure, and note anything near the boundaries.
Design and approvals
We draw the extension and check it against the rules for Northern Ireland, then apply for planning permission or a certificate of lawfulness, whichever fits.
Price it properly
Once the engineer's calculations are in, we fix the build price in writing, with a clear list of what's included.
Build it
The new structure goes up first, then we open into the house, finish inside and get the completion certificate.
Questions about first-floor extensions in Dundonald
How long does a first-floor extension take?
Allow 4 to 8 weeks for survey and design, then the approval period (councils aim to decide local applications within an average of 15 weeks; many take longer), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.
Who handles building control for a project in Dundonald?
We handle it as part of the project. What's needed in Northern Ireland: building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.
Do I need planning permission for a first-floor extension in Dundonald?
Dundonald is in Northern Ireland. It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.
Can I build on top of my existing single-storey extension?
Often yes, but only after the structure has been checked. Foundations, walls and lintels built for one storey may not carry two. We dig trial holes, look for the original building control approval and ask the structural engineer to confirm what can stay, what needs strengthening and what must be rebuilt.
What happens to the room below while the first floor is built?
The old roof is removed, so the room below is exposed for a short period. We fit temporary weather protection, plan the work so the roof comes off only when the new structure is ready, and agree with you which rooms will be out of use and for roughly how long.
Nearby
Close to Dundonald? We work across the area, including:
Other extensions in Dundonald
- Rear
- Side
- Wraparound
- Part two-storey
- Over a garage
- Semi-detached
- Detached
- Kitchen and bedrooms
- Bedroom and en-suite
All two-storey extension services in Dundonald · First-floor extensions across County Down
Send us your postcode and a few details. We'll get back to you to arrange a visit and talk through your options.