First-floor extensions in Carryduff
We cover Carryduff and the rest of County Down for first-floor extensions. Start with a free site visit and a plain-English view of what your house and plot can take.
Before you start in Carryduff, here's what applies.
- Postcode districts
- BT8
- County / area
- County Down, Northern Ireland
- Price region
- Northern Ireland
- Guide price
- £22,000–£32,000 (£1,580–£2,290 per m²)
- Approval route
- It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.
- Nearest towns
- Castlereagh (3.8 miles), Belfast (5.7 miles), Lisburn (6 miles)
- Distance to Bangor (County Down)
- about 13.2 miles
- First visit
- Free, no obligation
About a first-floor extension
A first-floor extension suits you if your house already has a single-storey extension and you need more space upstairs. You get a structural check of the existing walls and foundations, a design that ties the new floor into the house, the approvals your nation needs, building regulations approval and the build, managed by us and carried out by vetted teams working under S&K.
Carryduff sits about 13.2 miles from Bangor (County Down). Closer to home, Castlereagh is 3.8 miles away and Belfast 5.7 miles.
What it costs in Carryduff
For budgeting in Carryduff, allow around £22,000–£32,000 for a first-floor extension with 4 m × 3.5 m of new first-floor space (14 m²). That's based on £1,580–£2,290 per m² including VAT for Northern Ireland. Kitchens, bathroom fittings and flooring are priced separately so you can compare like with like.
| Spec | Per m² | 4 m × 3.5 m of new first-floor space (14 m²) |
|---|---|---|
| Essential | £1,460–£2,100 per m² | £20,500–£29,500 |
| Standard | £1,580–£2,290 per m² | £22,000–£32,000 |
| Premium | £1,900–£2,750 per m² | £26,500–£38,500 |
Planning and building control in Carryduff
In Northern Ireland, a first floor over a rear extension can be permitted development if the extension goes no more than 3 m beyond the original rear wall and stays at least 7 m from the rear boundary, with height, materials and roof pitch conditions. Over a side extension, or beyond these limits, a planning application costs £347 per dwelling.
Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.
Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.
Design points for Carryduff homes
Can the existing structure take it?
Many single-storey extensions were built with foundations, walls and lintels sized for one storey. We find out what is there with trial holes and, where available, the original building control drawings. The engineer then decides whether to reuse, strengthen or rebuild parts of the structure.
Tying into the house
The new floor and walls must line up with the existing first floor, often through a new opening in the rear wall above the old one. Floor levels, the position of upstairs windows and the existing roof all affect where the opening can go, so we survey both floors carefully.
How we'd run your project
Measure and listen
A visit to Carryduff to understand how you live in the house now and what the extra rooms need to do, plus a first look at the structure.
Choose the approval route
Some designs fit permitted development, most need a householder application. We decide which applies in Northern Ireland before drawing in detail.
Price it properly
Once the engineer's calculations are in, we fix the build price in writing, with a clear list of what's included.
Build it
The new structure goes up first, then we open into the house, finish inside and get the completion certificate.
Questions about first-floor extensions in Carryduff
How long does a first-floor extension take?
Allow 4 to 8 weeks for survey and design, then the approval period (councils aim to decide local applications within an average of 15 weeks; many take longer), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.
Do I need planning permission for a first-floor extension in Carryduff?
Carryduff is in Northern Ireland. It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.
How much does a first-floor extension cost in Carryduff?
Our guide for Northern Ireland, which covers Carryduff, is £1,580–£2,290 per m² including VAT. A typical project with 4 m × 3.5 m of new first-floor space (14 m²) comes to about £22,000–£32,000. Design and approval fees are extra, and we fix the build price in writing once the design is agreed.
Can I build on top of my existing single-storey extension?
Often yes, but only after the structure has been checked. Foundations, walls and lintels built for one storey may not carry two. We dig trial holes, look for the original building control approval and ask the structural engineer to confirm what can stay, what needs strengthening and what must be rebuilt.
What happens to the room below while the first floor is built?
The old roof is removed, so the room below is exposed for a short period. We fit temporary weather protection, plan the work so the roof comes off only when the new structure is ready, and agree with you which rooms will be out of use and for roughly how long.
Nearby
Other towns near Carryduff:
Other extensions in Carryduff
- Rear
- Side
- Wraparound
- Part two-storey
- Over a garage
- Semi-detached
- Detached
- Kitchen and bedrooms
- Bedroom and en-suite
All two-storey extension services in Carryduff · First-floor extensions across County Down
Want a figure first? Try our guide price tool, then book a free visit to firm it up.