Bedford · Bedfordshire

First-floor extensions in Bedford

We cover Bedford and the rest of Bedfordshire for first-floor extensions. Start with a free site visit and a plain-English view of what your house and plot can take.

What we'd confirm first for a project in Bedford.

Postcode districts
MK40, MK41, MK42 and MK44
County / area
Bedfordshire, England
Price region
East of England
Guide price
£26,000–£37,500 (£1,850–£2,680 per m²)
Approval route
It may be permitted development if it goes no more than 3 m beyond the original rear wall (counting any single-storey part) and stays 7 m from the rear boundary; otherwise it needs planning permission.
Nearest towns
Kempston (1.9 miles), Kempston Hardwick (3.4 miles), Sandy (7.5 miles)
Distance to Luton
about 17.7 miles
First visit
Free, no obligation

About a first-floor extension

A first-floor extension is a new upstairs room built on top of an existing single-storey part of your house, such as a rear kitchen extension, a utility or a side annexe. It adds a bedroom, bathroom or study without enlarging the footprint. Whether it works depends mainly on whether the walls and foundations below can carry the extra load.

We cover postcode districts MK40, MK41, MK42 and MK44 in and around Bedford, along with neighbouring Kempston, Kempston Hardwick and Sandy.

What it costs in Bedford

Using our East of England rates, a first-floor extension with 4 m × 3.5 m of new first-floor space (14 m²) comes to about £26,000–£37,500, including VAT. Bigger or more glazed designs cost more per m². Design fees, structural calculations and approval fees are separate and listed on our prices page.

SpecPer m²4 m × 3.5 m of new first-floor space (14 m²)
Essential£1,710–£2,460 per m²£24,000–£34,500
Standard£1,850–£2,680 per m²£26,000–£37,500
Premium£2,220–£3,210 per m²£31,000–£45,000

Planning and building regulations in Bedford

In England, adding a first floor turns a single-storey extension into one of more than one storey. To be permitted development, the extension as a whole must go no more than 3 m beyond the rear wall of the original house and stay at least 7 m from the rear boundary, with matching materials and roof pitch. Over a side extension it always needs planning permission, costing £548 (or £575 for applications made from 8 December 2026).

Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.

Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.

Design points for Bedford homes

Replacing the flat roof

The existing roof usually comes off and is replaced by a new first-floor structure. The room below is exposed for a short time, so we plan temporary weatherproofing and sequence the work to keep the kitchen or living room usable for as long as possible.

Tying into the house

The new floor and walls must line up with the existing first floor, often through a new opening in the rear wall above the old one. Floor levels, the position of upstairs windows and the existing roof all affect where the opening can go, so we survey both floors carefully.

How we'd run your project

  1. Visit and first ideas

    One of our team visits your house in Bedford, checks the walls, roof and drains, and sketches out options with you.

  2. Drawings and permission

    Our designers produce plans and elevations, then we take care of planning or permitted development checks with the council covering Bedford.

  3. Fixed price in writing

    With approved drawings and calculations, we give you a fixed build price and a programme you can plan around.

  4. Build and hand over

    We manage the build from groundworks to decoration-ready finish and hand over with the completion paperwork.

Questions about first-floor extensions in Bedford

Which postcodes do you cover around Bedford?

We cover Bedford (MK40, MK41, MK42 and MK44) and nearby places including Kempston, Kempston Hardwick and Sandy, plus the rest of Bedfordshire. The first site visit is free.

How long does a first-floor extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils should decide householder applications within 8 weeks of validation), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Do I need planning permission for a first-floor extension in Bedford?

Bedford is in England, so England planning rules apply. It may be permitted development if it goes no more than 3 m beyond the original rear wall (counting any single-storey part) and stays 7 m from the rear boundary; otherwise it needs planning permission. If in doubt, a lawful development certificate or a planning application gives you certainty before you build.

Will the first-floor extension match my house?

It should, and in England matching materials and roof pitch is a condition of permitted development. We match brick, tile, mortar colour and window style where we can, and tell you at the design stage if an exact brick match is not available, so you can choose between the closest match and render or cladding.

What happens to the room below while the first floor is built?

The old roof is removed, so the room below is exposed for a short period. We fit temporary weather protection, plan the work so the roof comes off only when the new structure is ready, and agree with you which rooms will be out of use and for roughly how long.

Nearby

Nearby towns we cover for first-floor extensions:

Other extensions in Bedford

All two-storey extension services in Bedford · First-floor extensions across Bedfordshire

Ready to talk it through? Call us or send the form and we'll arrange a visit to your home in Bedford.

CallGuide price