Coleraine · County Londonderry

First-floor extensions in Coleraine

For a first-floor extension in Coleraine, the first questions are always the same: how big, which approvals, and what it will cost. This page answers all three for County Londonderry.

Useful details for planning a first-floor extension in Coleraine.

Postcode districts
BT51 and BT52
County / area
County Londonderry, Northern Ireland
Price region
Northern Ireland
Guide price
£22,000–£32,000 (£1,580–£2,290 per m²)
Approval route
It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.
Nearest towns
Portstewart (3.8 miles), Portrush (4.4 miles), Ballymoney (7.5 miles)
Distance to Derry
about 27.1 miles
First visit
Free, no obligation

About a first-floor extension

A first-floor extension suits you if your house already has a single-storey extension and you need more space upstairs. You get a structural check of the existing walls and foundations, a design that ties the new floor into the house, the approvals your nation needs, building regulations approval and the build, managed by us and carried out by vetted teams working under S&K.

We cover Coleraine (BT51 and BT52) and the places around it, including Portstewart (3.8 miles), Portrush (4.4 miles) and Ballymoney.

What it costs in Coleraine

For budgeting in Coleraine, allow around £22,000–£32,000 for a first-floor extension with 4 m × 3.5 m of new first-floor space (14 m²). That's based on £1,580–£2,290 per m² including VAT for Northern Ireland. We'll give you a written design-stage price first, then a fixed build price once the drawings are agreed.

SpecPer m²4 m × 3.5 m of new first-floor space (14 m²)
Essential£1,460–£2,100 per m²£20,500–£29,500
Standard£1,580–£2,290 per m²£22,000–£32,000
Premium£1,900–£2,750 per m²£26,500–£38,500

Planning and building control in Coleraine

In Northern Ireland, a first floor over a rear extension can be permitted development if the extension goes no more than 3 m beyond the original rear wall and stays at least 7 m from the rear boundary, with height, materials and roof pitch conditions. Over a side extension, or beyond these limits, a planning application costs £347 per dwelling.

Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.

Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.

Design points for Coleraine homes

Can the existing structure take it?

Many single-storey extensions were built with foundations, walls and lintels sized for one storey. We find out what is there with trial holes and, where available, the original building control drawings. The engineer then decides whether to reuse, strengthen or rebuild parts of the structure.

Tying into the house

The new floor and walls must line up with the existing first floor, often through a new opening in the rear wall above the old one. Floor levels, the position of upstairs windows and the existing roof all affect where the opening can go, so we survey both floors carefully.

How we'd run your project

  1. Look at the house

    We start in Coleraine with a free visit: measurements, photos, a look at the loft and drains, and a frank chat about budget.

  2. Design and approvals

    We draw the extension and check it against the rules for Northern Ireland, then apply for planning permission or a certificate of lawfulness, whichever fits.

  3. Price it properly

    Once the engineer's calculations are in, we fix the build price in writing, with a clear list of what's included.

  4. Build and sign-off

    Vetted teams working under S&K build the extension, and we arrange the building control completion certificate at the end.

Questions about first-floor extensions in Coleraine

Who handles building control for a project in Coleraine?

We handle it as part of the project. What's needed in Northern Ireland: building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.

Which postcodes do you cover around Coleraine?

We cover Coleraine (BT51 and BT52) and nearby places including Portstewart, Portrush and Ballymoney, plus the rest of County Londonderry. The first site visit is free.

How long does a first-floor extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils aim to decide local applications within an average of 15 weeks; many take longer), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Can I build on top of my existing single-storey extension?

Often yes, but only after the structure has been checked. Foundations, walls and lintels built for one storey may not carry two. We dig trial holes, look for the original building control approval and ask the structural engineer to confirm what can stay, what needs strengthening and what must be rebuilt.

What happens to the room below while the first floor is built?

The old roof is removed, so the room below is exposed for a short period. We fit temporary weather protection, plan the work so the roof comes off only when the new structure is ready, and agree with you which rooms will be out of use and for roughly how long.

Nearby

Nearby towns we cover for first-floor extensions:

Other extensions in Coleraine

All two-storey extension services in Coleraine · First-floor extensions across County Londonderry

Ready to talk it through? Call us or send the form and we'll arrange a visit to your home in Coleraine.