Coleraine · County Londonderry

Two-storey side extensions in Coleraine

Homes in Coleraine with a bit of space to the side or rear can often take a two-storey side extension. We'll tell you honestly whether yours can, and what approvals it needs.

Before you start in Coleraine, here's what applies.

Postcode districts
BT51 and BT52
County / area
County Londonderry, Northern Ireland
Price region
Northern Ireland
Guide price
£76,000–£101,500 (£1,800–£2,420 per m²)
Approval route
Planning permission is needed: permitted development side extensions in Northern Ireland can't be more than 4 m high, which rules out two storeys.
Nearest towns
Portstewart (3.8 miles), Portrush (4.4 miles), Ballymoney (7.5 miles)
Distance to Derry
about 27.1 miles
First visit
Free, no obligation

About a two-storey side extension

A two-storey side extension is a new two-floor addition built into the space beside your house, often over a driveway or side passage. It typically adds one or two bedrooms upstairs and a utility, study or larger kitchen below, without giving up rear garden.

We cover postcode districts BT51 and BT52 in and around Coleraine, along with neighbouring Portstewart, Portrush and Ballymoney.

What it costs in Coleraine

A guide price for Coleraine: around £76,000–£101,500 for a 3 m × 7 m footprint on two floors (42 m² of new floor space). That works out at £1,800–£2,420 per m² of new floor space, including VAT at 20%. We'll give you a written design-stage price first, then a fixed build price once the drawings are agreed.

SpecPer m²A 3 m × 7 m footprint on two floors (42 m² of new floor space)
Essential£1,660–£2,230 per m²£69,500–£93,500
Standard£1,800–£2,420 per m²£76,000–£101,500
Premium£2,160–£2,900 per m²£91,000–£122,000

Planning and building control in Coleraine

In Northern Ireland, permitted development for two-storey work is set out for rear extensions, so a two-storey side extension normally needs a planning application. The fee is £347 per dwelling, and councils aim for an average of 15 weeks on local applications. You also need building control approval from the council under the Technical Booklets.

Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.

Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.

Design points for Coleraine homes

Avoiding a terracing effect

Where semi-detached houses sit close together, side extensions on neighbouring houses can join up and turn a row of pairs into a terrace. Many councils ask for a gap to the boundary at first floor to stop this, so we check local guidance before fixing the width.

Side windows, boundaries and gutters

Upstairs windows in the side wall face the neighbour, so they are usually obscure-glazed and fixed, or left out. Building close to the boundary also raises questions about foundations, overhanging gutters and access for maintenance, so we design the eaves and gutter to stay within your land.

How we'd run your project

  1. Look at the house

    We start in Coleraine with a free visit: measurements, photos, a look at the loft and drains, and a frank chat about budget.

  2. Design and approvals

    We draw the extension and check it against the rules for Northern Ireland, then apply for planning permission or a certificate of lawfulness, whichever fits.

  3. Technical design

    We prepare the building regulations drawings, structural calculations and specification so the build price can be fixed.

  4. On site

    One project lead runs the job, keeps you updated and arranges inspections at each stage until completion.

Questions about two-storey side extensions in Coleraine

How long does a two-storey side extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils aim to decide local applications within an average of 15 weeks; many take longer), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Who handles building control for a project in Coleraine?

We handle it as part of the project. What's needed in Northern Ireland: building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.

Which postcodes do you cover around Coleraine?

We cover Coleraine (BT51 and BT52) and nearby places including Portstewart, Portrush and Ballymoney, plus the rest of County Londonderry. The first site visit is free.

How much does a two-storey side extension cost in Coleraine?

Our guide for Northern Ireland, which covers Coleraine, is £1,800–£2,420 per m² including VAT. A typical project with a 3 m × 7 m footprint on two floors (42 m² of new floor space) comes to about £76,000–£101,500. Design and approval fees are extra, and we fix the build price in writing once the design is agreed.

Can I build a two-storey side extension over my driveway?

Yes, if the drive is wide enough for a useful room and the council accepts the design. You may lose off-road parking, which some councils weigh up, and the foundations need to suit the ground below. We check parking, drains and meter positions at the free site visit before any drawings are prepared.

Nearby

Nearby towns we cover for two-storey side extensions:

Other extensions in Coleraine

All two-storey extension services in Coleraine · Two-storey side extensions across County Londonderry

The quickest next step is a visit. We'll look at your house in Coleraine and give you an honest view of the options.

CallGuide price