Dover · Kent

First-floor extensions in Dover

We cover Dover and the rest of Kent for first-floor extensions. Start with a free site visit and a plain-English view of what your house and plot can take.

Quick reference for homeowners in Dover.

Postcode districts
CT15, CT16 and CT17
County / area
Kent, England
Price region
South East England
Guide price
£27,500–£40,000 (£1,980–£2,860 per m²)
Approval route
It may be permitted development if it goes no more than 3 m beyond the original rear wall (counting any single-storey part) and stays 7 m from the rear boundary; otherwise it needs planning permission.
Nearest towns
Folkestone (7 miles), Deal (7.8 miles), Hythe (Kent) (10.6 miles)
Distance to Maidstone
about 35.8 miles
First visit
Free, no obligation

About a first-floor extension

A first-floor extension suits you if your house already has a single-storey extension and you need more space upstairs. You get a structural check of the existing walls and foundations, a design that ties the new floor into the house, the approvals your nation needs, building regulations approval and the build, managed by us and carried out by vetted teams working under S&K.

Around Dover we also work in Folkestone, Deal and Hythe (Kent), and across the rest of Kent. Postcode districts in and near Dover: CT15, CT16 and CT17.

What it costs in Dover

Expect a first-floor extension in Dover to land somewhere around £27,500–£40,000 for 4 m × 3.5 m of new first-floor space (14 m²). Our South East England guide rate is £1,980–£2,860 per m², including VAT. These are guides, not quotes. Ground conditions, steelwork and access can move the figure either way.

SpecPer m²4 m × 3.5 m of new first-floor space (14 m²)
Essential£1,820–£2,630 per m²£25,500–£37,000
Standard£1,980–£2,860 per m²£27,500–£40,000
Premium£2,380–£3,430 per m²£33,500–£48,000

Planning and building regulations in Dover

In England, adding a first floor turns a single-storey extension into one of more than one storey. To be permitted development, the extension as a whole must go no more than 3 m beyond the rear wall of the original house and stay at least 7 m from the rear boundary, with matching materials and roof pitch. Over a side extension it always needs planning permission, costing £548 (or £575 for applications made from 8 December 2026).

Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.

Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.

Design points for Dover homes

Tying into the house

The new floor and walls must line up with the existing first floor, often through a new opening in the rear wall above the old one. Floor levels, the position of upstairs windows and the existing roof all affect where the opening can go, so we survey both floors carefully.

Escape and fire safety

A new first-floor bedroom needs an escape window with a clear opening of at least 0.33 m², at least 450 mm wide and 450 mm high, with the bottom no more than 1,100 mm above the floor, unless there is a protected route to the stairs.

How we'd run your project

  1. Understand the brief

    At your home in Dover we agree what you need: bedroom count, bathroom, kitchen space, and how much garden you want to keep.

  2. Plans, then approval

    Measured survey, design, then the right approval route for your house. We explain each step before we take it.

  3. Structure and building control

    A structural engineer sizes the foundations and steels, and we get building regulations approval before work starts.

  4. Build and sign-off

    Vetted teams working under S&K build the extension, and we arrange the building control completion certificate at the end.

Questions about first-floor extensions in Dover

Who handles building regulations for a project in Dover?

We handle it as part of the project. What's needed in England: building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.

Which postcodes do you cover around Dover?

We cover Dover (CT15, CT16 and CT17) and nearby places including Folkestone, Deal and Hythe (Kent), plus the rest of Kent. The first site visit is free.

How long does a first-floor extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils should decide householder applications within 8 weeks of validation), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Will the first-floor extension match my house?

It should, and in England matching materials and roof pitch is a condition of permitted development. We match brick, tile, mortar colour and window style where we can, and tell you at the design stage if an exact brick match is not available, so you can choose between the closest match and render or cladding.

What happens to the room below while the first floor is built?

The old roof is removed, so the room below is exposed for a short period. We fit temporary weather protection, plan the work so the roof comes off only when the new structure is ready, and agree with you which rooms will be out of use and for roughly how long.

Nearby

We also cover places near Dover, including:

Other extensions in Dover

All two-storey extension services in Dover · First-floor extensions across Kent

Tell us about your house in Dover and we'll call you back to arrange a free, no-obligation visit.

CallGuide price