First-floor extensions in Gravesend
If you live in Gravesend and need more room without moving, a first-floor extension is worth a serious look. We handle the drawings, approvals, structure and build.
Useful details for planning a first-floor extension in Gravesend.
- Postcode districts
- DA11 and DA12
- County / area
- Kent, England
- Price region
- South East England
- Guide price
- £27,500–£40,000 (£1,980–£2,860 per m²)
- Approval route
- It may be permitted development if it goes no more than 3 m beyond the original rear wall (counting any single-storey part) and stays 7 m from the rear boundary; otherwise it needs planning permission.
- Nearest towns
- Tilbury (1.5 miles), Swanscombe (2.6 miles), Chadwell St Mary (2.7 miles)
- Distance to Maidstone
- about 13.7 miles
- First visit
- Free, no obligation
About a first-floor extension
A first-floor extension is a new upstairs room built on top of an existing single-storey part of your house, such as a rear kitchen extension, a utility or a side annexe. It adds a bedroom, bathroom or study without enlarging the footprint. Whether it works depends mainly on whether the walls and foundations below can carry the extra load.
We cover postcode districts DA11 and DA12 in and around Gravesend, along with neighbouring Tilbury, Swanscombe and Chadwell St Mary.
What it costs in Gravesend
Most of the cost of a first-floor extension is set by its size and specification. For Gravesend and the rest of South East England, our guide is £1,980–£2,860 per m² including VAT, so about £27,500–£40,000 for 4 m × 3.5 m of new first-floor space (14 m²). Professional fees for drawings and the structural engineer are listed separately on our prices page.
| Spec | Per m² | 4 m × 3.5 m of new first-floor space (14 m²) |
|---|---|---|
| Essential | £1,820–£2,630 per m² | £25,500–£37,000 |
| Standard | £1,980–£2,860 per m² | £27,500–£40,000 |
| Premium | £2,380–£3,430 per m² | £33,500–£48,000 |
Planning and building regulations in Gravesend
In England, adding a first floor turns a single-storey extension into one of more than one storey. To be permitted development, the extension as a whole must go no more than 3 m beyond the rear wall of the original house and stay at least 7 m from the rear boundary, with matching materials and roof pitch. Over a side extension it always needs planning permission, costing £548 (or £575 for applications made from 8 December 2026).
Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.
Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.
Design points for Gravesend homes
Replacing the flat roof
The existing roof usually comes off and is replaced by a new first-floor structure. The room below is exposed for a short time, so we plan temporary weatherproofing and sequence the work to keep the kitchen or living room usable for as long as possible.
Matching the roofline
A first-floor extension often changes how the back or side of the house looks more than the original single storey did. Matching the main roof pitch and materials, and keeping the ridge below the main ridge, usually gives the best result and is expected for permitted development in England.
How we'd run your project
Understand the brief
At your home in Gravesend we agree what you need: bedroom count, bathroom, kitchen space, and how much garden you want to keep.
Get it approved
Once you're happy with the design we submit it to the council for Gravesend and deal with any questions from the planning officer.
Structure and building control
A structural engineer sizes the foundations and steels, and we get building regulations approval before work starts.
Build it
The new structure goes up first, then we open into the house, finish inside and get the completion certificate.
Questions about first-floor extensions in Gravesend
How long does a first-floor extension take?
Allow 4 to 8 weeks for survey and design, then the approval period (councils should decide householder applications within 8 weeks of validation), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.
How much does a first-floor extension cost in Gravesend?
Our guide for South East England, which covers Gravesend, is £1,980–£2,860 per m² including VAT. A typical project with 4 m × 3.5 m of new first-floor space (14 m²) comes to about £27,500–£40,000. Design and approval fees are extra, and we fix the build price in writing once the design is agreed.
Which postcodes do you cover around Gravesend?
We cover Gravesend (DA11 and DA12) and nearby places including Tilbury, Swanscombe and Chadwell St Mary, plus the rest of Kent. The first site visit is free.
Will the first-floor extension match my house?
It should, and in England matching materials and roof pitch is a condition of permitted development. We match brick, tile, mortar colour and window style where we can, and tell you at the design stage if an exact brick match is not available, so you can choose between the closest match and render or cladding.
What happens to the room below while the first floor is built?
The old roof is removed, so the room below is exposed for a short period. We fit temporary weather protection, plan the work so the roof comes off only when the new structure is ready, and agree with you which rooms will be out of use and for roughly how long.
Nearby
Close to Gravesend? We work across the area, including:
Other extensions in Gravesend
- Rear
- Side
- Wraparound
- Part two-storey
- Over a garage
- Semi-detached
- Detached
- Kitchen and bedrooms
- Bedroom and en-suite
All two-storey extension services in Gravesend · First-floor extensions across Kent
Send us your postcode and a few details. We'll get back to you to arrange a visit and talk through your options.