Cookstown · County Tyrone

Kitchen extensions with bedrooms above in Cookstown

We cover Cookstown and the rest of County Tyrone for kitchen extensions with bedrooms above. Start with a free site visit and a plain-English view of what your house and plot can take.

Cookstown: the key facts for this kind of project.

Postcode districts
BT80
County / area
County Tyrone, Northern Ireland
Price region
Northern Ireland
Guide price
£49,500–£66,500 (£1,760–£2,380 per m²), kitchen units and worktops priced separately
Approval route
It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.
Nearest towns
Coalisland (7.2 miles), Magherafelt (9.4 miles), Dungannon (9.7 miles)
Distance to Omagh
about 22.4 miles
First visit
Free, no obligation

About a kitchen extension with bedrooms above

A kitchen extension with bedrooms above is a two-storey extension designed so the ground floor becomes a larger, usually open-plan kitchen and dining space, with one or two bedrooms or a bathroom on the first floor. It is a natural fit for a two-storey rear extension. The key design issues are the steel beams that open up the house, glazing and ventilation.

Cookstown sits about 22.4 miles from Omagh. Closer to home, Coalisland is 7.2 miles away and Magherafelt 9.4 miles.

What it costs in Cookstown

In Northern Ireland, which includes Cookstown, we'd expect a kitchen extension with bedrooms above to cost around £49,500–£66,500 (kitchen units and worktops priced separately) for a 4 m × 3.5 m footprint on two floors (28 m² of new floor space), or £1,760–£2,380 per m² including VAT. The fastest way to a firmer number is a free site visit, after which we price the design stage in writing.

SpecPer m²A 4 m × 3.5 m footprint on two floors (28 m² of new floor space)
Essential£1,620–£2,190 per m²£45,500–£61,000
Standard£1,760–£2,380 per m²£49,500–£66,500
Premium£2,110–£2,850 per m²£59,000–£80,000

Planning and building control in Cookstown

In Northern Ireland, a kitchen extension with bedrooms above can be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary, with height, materials and roof pitch conditions. Otherwise a planning application costs £347 per dwelling, and building control approval from the council is needed.

Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.

Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.

Design points for Cookstown homes

Steel beams and the open-plan opening

Removing the old rear wall to make one large room means a steel beam, sometimes several, to carry the first floor and roof. The engineer sizes the steel and its supports, and we decide early whether you want a flush ceiling with the beam hidden or a downstand, as this affects ceiling heights.

Services and drainage

Sinks, dishwashers and an upstairs bathroom all need waste routes to the drains, often near where the extension goes. We check the drains early and plan soil stacks, gas and electrical supplies so the kitchen layout is not limited later.

How we'd run your project

  1. Start at your house

    We come to your home in Cookstown, measure up, check the ground floor walls and roof structure, and note anything near the boundaries.

  2. Plans, then approval

    Measured survey, design, then the right approval route for your house. We explain each step before we take it.

  3. Fixed price in writing

    With approved drawings and calculations, we give you a fixed build price and a programme you can plan around.

  4. Build it

    The new structure goes up first, then we open into the house, finish inside and get the completion certificate.

Questions about kitchen extensions with bedrooms above in Cookstown

How long does a kitchen extension with bedrooms above take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils aim to decide local applications within an average of 15 weeks; many take longer), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Do I need planning permission for a kitchen extension with bedrooms above in Cookstown?

Cookstown is in Northern Ireland. It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.

Who handles building control for a project in Cookstown?

We handle it as part of the project. What's needed in Northern Ireland: building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.

Can I keep using my kitchen during the build?

For part of it. The new structure can be built while your existing kitchen stays in use, but when the rear wall is opened and the new kitchen is fitted there will be several weeks without one. We plan when this happens and help you set up a temporary kitchen elsewhere in the house.

Is it cheaper to build a kitchen extension and bedrooms at the same time?

Yes, in most cases. Building both floors at once means one set of foundations, one roof, one scaffold and one set of approvals. Adding a first floor later means removing the original roof, possibly strengthening the foundations and disrupting the kitchen again. If you think you will need the bedroom, build it now.

Nearby

We also cover places near Cookstown, including:

Other extensions in Cookstown

All two-storey extension services in Cookstown · Kitchen extensions with bedrooms above across County Tyrone

Want a figure first? Try our guide price tool, then book a free visit to firm it up.