County Tyrone · Northern Ireland

Kitchen extensions with bedrooms above in County Tyrone

County Tyrone has a wide mix of house types, and most can take a well-designed kitchen extension with bedrooms above. Here's what's involved, the rules in Northern Ireland and typical costs.

County Tyrone at a glance

Nation
Northern Ireland
Price region
Northern Ireland
Postcode areas
BT
Towns covered
8 listed below, plus surrounding villages
Approval route
It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.
Site visits
Free, no obligation

What a kitchen extension with bedrooms above involves

A kitchen extension with bedrooms above is a two-storey extension designed so the ground floor becomes a larger, usually open-plan kitchen and dining space, with one or two bedrooms or a bathroom on the first floor. It is a natural fit for a two-storey rear extension. The key design issues are the steel beams that open up the house, glazing and ventilation.

Across County Tyrone we cover Omagh (BT78), Strabane (BT82), Dungannon (BT69), Cookstown (BT80), Coalisland (BT71) and Dromore (County Tyrone) (BT78), plus the smaller places around them.

Guide price in Northern Ireland

A guide price for County Tyrone: around £49,500–£66,500 (kitchen units and worktops priced separately) for a 4 m × 3.5 m footprint on two floors (28 m² of new floor space). That works out at £1,760–£2,380 per m² of new floor space, including VAT at 20%. Design fees, structural calculations and approval fees are separate and listed on our prices page.

SpecPer m²Typical project
Essential£1,620–£2,190 per m²£45,500–£61,000
Standard£1,760–£2,380 per m²£49,500–£66,500
Premium£2,110–£2,850 per m²£59,000–£80,000

Rules in Northern Ireland

In Northern Ireland, a kitchen extension with bedrooms above can be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary, with height, materials and roof pitch conditions. Otherwise a planning application costs £347 per dwelling, and building control approval from the council is needed.

Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.

Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.

There is no Party Wall Act in Northern Ireland. Shared walls and boundaries are a matter of title and common law, so we agree access and record conditions with neighbours before work starts.

Getting the design right

Services and drainage

Sinks, dishwashers and an upstairs bathroom all need waste routes to the drains, often near where the extension goes. We check the drains early and plan soil stacks, gas and electrical supplies so the kitchen layout is not limited later.

Steel beams and the open-plan opening

Removing the old rear wall to make one large room means a steel beam, sometimes several, to carry the first floor and roof. The engineer sizes the steel and its supports, and we decide early whether you want a flush ceiling with the beam hidden or a downstand, as this affects ceiling heights.

How we work in County Tyrone

  1. Free site visit

    We visit your home in County Tyrone, look at the structure, access and boundaries, and talk through what you want the new rooms to do.

  2. Get it approved

    Once you're happy with the design we submit it to the council for County Tyrone and deal with any questions from the planning officer.

  3. Technical design

    We prepare the building regulations drawings, structural calculations and specification so the build price can be fixed.

  4. Build and hand over

    We manage the build from groundworks to decoration-ready finish and hand over with the completion paperwork.

Towns we cover in County Tyrone

Kitchen extensions with bedrooms above in County Tyrone: questions

How much does a kitchen extension with bedrooms above cost in County Tyrone?

In Northern Ireland our guide is £1,760–£2,380 per m² including VAT, so about £49,500–£66,500 (kitchen units and worktops priced separately) for a 4 m × 3.5 m footprint on two floors (28 m² of new floor space). Essential and Premium specs move that by roughly 8% down or 20% up.

Is it cheaper to build a kitchen extension and bedrooms at the same time?

Yes, in most cases. Building both floors at once means one set of foundations, one roof, one scaffold and one set of approvals. Adding a first floor later means removing the original roof, possibly strengthening the foundations and disrupting the kitchen again. If you think you will need the bedroom, build it now.

Can I keep using my kitchen during the build?

For part of it. The new structure can be built while your existing kitchen stays in use, but when the rear wall is opened and the new kitchen is fitted there will be several weeks without one. We plan when this happens and help you set up a temporary kitchen elsewhere in the house.

Will I need planning permission in County Tyrone?

County Tyrone is in Northern Ireland. It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.

Neighbouring areas

All extension services in County Tyrone · About kitchen extensions with bedrooms above

Ready to see what a second storey could do for your home?

Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.

CallGuide price