Part single, part two-storey extensions in Burntisland

For a part single, part two-storey extension in Burntisland, the first questions are always the same: how big, which approvals, and what it will cost. This page answers all three for Fife.

Useful details for planning a part single, part two-storey extension in Burntisland.

Postcode districts
KY3
County / area
Fife, Scotland
Price region
Scotland
Guide price
£67,500–£93,000 (£1,880–£2,580 per m²)
Approval route
Planning permission is usually needed: Class 1B permitted development only applies if every part of the extension is at least 10 m from all boundaries. A building warrant is needed before work starts.
Nearest towns
Dalgety Bay (4.7 miles), Kirkcaldy (5 miles), Cowdenbeath (5.5 miles)
Distance to Dunfermline
about 8.6 miles
First visit
Free, no obligation

About a part single, part two-storey extension

A part single, part two-storey extension is an extension where the ground floor is wider or deeper than the floor above, so only part of it rises to two storeys. It usually gives a large kitchen or living area with roof lights below and one bedroom or bathroom above. It is often a good way to add space while limiting the effect on neighbours.

We cover postcode district KY3 in and around Burntisland, along with neighbouring Dalgety Bay, Kirkcaldy and Cowdenbeath.

What it costs in Burntisland

A guide price for Burntisland: around £67,500–£93,000 for a 6 m × 4 m ground floor and a first floor over half of it (36 m² in total). That works out at £1,880–£2,580 per m² of new floor space, including VAT at 20%. These are guides, not quotes. Ground conditions, steelwork and access can move the figure either way.

SpecPer m²A 6 m × 4 m ground floor and a first floor over half of it (36 m² in total)
Essential£1,730–£2,380 per m²£62,500–£85,500
Standard£1,880–£2,580 per m²£67,500–£93,000
Premium£2,260–£3,100 per m²£81,000–£111,500

Planning and building standards in Burntisland

In Scotland, because part of the extension is more than one storey, it is assessed under Class 1B, which needs at least 10 m to every boundary for permitted development. On most plots that is not possible, so the extension needs a householder application (£371, decided within two months). A building warrant is also needed before any work starts.

Approval in Scotland: Householder planning application: £371. Councils have two months to decide a local planning application.

Building standards: A building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks.

Design points for Burntisland homes

Structure at the step

The first-floor wall above often sits over the new open-plan space, so it needs a steel beam or frame to carry it. Loads come down at different points than in a full two-storey design, and the engineer sizes the foundations to suit each part.

The roof junction

Where the single-storey roof meets the two-storey wall you need a sound weathering detail, usually a lead or similar flashing, and enough height for roof lights or a lantern. We set the roof falls and the upstairs window sill heights together so they do not clash.

How we'd run your project

  1. Free site visit

    We visit your home in Burntisland, look at the structure, access and boundaries, and talk through what you want the new rooms to do.

  2. Get it approved

    Once you're happy with the design we submit it to the council for Burntisland and deal with any questions from the planning officer.

  3. Detail and price

    Construction drawings, engineer's calculations and building warrant approval, then a written fixed price for the build.

  4. Build it

    The new structure goes up first, then we open into the house, finish inside and get the completion certificate.

Questions about part single, part two-storey extensions in Burntisland

How long does a part single, part two-storey extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils have two months to decide a local planning application), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Who handles building standards for a project in Burntisland?

We handle it as part of the project. What's needed in Scotland: a building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.

Do I need planning permission for a part single, part two-storey extension in Burntisland?

Burntisland is in Scotland. Planning permission is usually needed: Class 1B permitted development only applies if every part of the extension is at least 10 m from all boundaries. A building warrant is needed before work starts.

Which side should the two-storey part go on?

Usually the side furthest from the nearest neighbour's windows, so the single-storey part sits nearest them and keeps their light. Other factors are where the stairs land upstairs, which room needs the extra space and where drains run. We sketch options at the design stage and explain which is most likely to be approved.

Can the single-storey part be deeper than the two-storey part?

With planning permission, yes, and that is often the point of the design: the ground floor projects further into the garden while the first floor stays back from neighbours. Under permitted development, the depth limits for extensions of more than one storey can apply to the whole extension, so we confirm which route applies before drawings are finalised.

Nearby

The same service in neighbouring towns:

Other extensions in Burntisland

All two-storey extension services in Burntisland · Part single, part two-storey extensions across Fife

Tell us about your house in Burntisland and we'll call you back to arrange a free, no-obligation visit.