Part single, part two-storey extensions in Dromore (County Down)
We plan and build part single, part two-storey extensions for homeowners in Dromore (County Down) and nearby. Every project starts with a free visit and a design stage priced in writing before any work begins.
The basics for Dromore (County Down) at a glance.
- Postcode districts
- BT25
- County / area
- County Down, Northern Ireland
- Price region
- Northern Ireland
- Guide price
- £63,500–£87,000 (£1,760–£2,420 per m²)
- Approval route
- It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.
- Nearest towns
- Donaghcloney (4.4 miles), Moira (5.6 miles), Waringstown (6.2 miles)
- Distance to Bangor (County Down)
- about 25.8 miles
- First visit
- Free, no obligation
About a part single, part two-storey extension
A part single, part two-storey extension is an extension where the ground floor is wider or deeper than the floor above, so only part of it rises to two storeys. It usually gives a large kitchen or living area with roof lights below and one bedroom or bathroom above. It is often a good way to add space while limiting the effect on neighbours.
We cover Dromore (County Down) (BT25) and the places around it, including Donaghcloney (4.4 miles), Moira (5.6 miles) and Waringstown.
What it costs in Dromore (County Down)
A guide price for Dromore (County Down): around £63,500–£87,000 for a 6 m × 4 m ground floor and a first floor over half of it (36 m² in total). That works out at £1,760–£2,420 per m² of new floor space, including VAT at 20%. Keep a contingency of around 10% for things nobody can see until the ground is opened up.
| Spec | Per m² | A 6 m × 4 m ground floor and a first floor over half of it (36 m² in total) |
|---|---|---|
| Essential | £1,620–£2,230 per m² | £58,500–£80,000 |
| Standard | £1,760–£2,420 per m² | £63,500–£87,000 |
| Premium | £2,110–£2,900 per m² | £76,000–£104,500 |
Planning and building control in Dromore (County Down)
In Northern Ireland, the extension can be permitted development if it goes no more than 3 m beyond the original rear wall and stays at least 7 m from the rear boundary, with height, materials and roof pitch conditions met. Specified protected areas are excluded. If the design goes further, a planning application costs £347 per dwelling, and building control approval is needed either way.
Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.
Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.
Design points for Dromore (County Down) homes
The roof junction
Where the single-storey roof meets the two-storey wall you need a sound weathering detail, usually a lead or similar flashing, and enough height for roof lights or a lantern. We set the roof falls and the upstairs window sill heights together so they do not clash.
Structure at the step
The first-floor wall above often sits over the new open-plan space, so it needs a steel beam or frame to carry it. Loads come down at different points than in a full two-storey design, and the engineer sizes the foundations to suit each part.
How we'd run your project
Visit and first ideas
One of our team visits your house in Dromore (County Down), checks the walls, roof and drains, and sketches out options with you.
Get it approved
Once you're happy with the design we submit it to the council for Dromore (County Down) and deal with any questions from the planning officer.
Fixed price in writing
With approved drawings and calculations, we give you a fixed build price and a programme you can plan around.
Build
Foundations, walls, floor, roof, windows, then first and second fix. We break through into the house as late as we can.
Questions about part single, part two-storey extensions in Dromore (County Down)
How long does a part single, part two-storey extension take?
Allow 4 to 8 weeks for survey and design, then the approval period (councils aim to decide local applications within an average of 15 weeks; many take longer), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.
Do I need planning permission for a part single, part two-storey extension in Dromore (County Down)?
Dromore (County Down) is in Northern Ireland. It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.
Which postcodes do you cover around Dromore (County Down)?
We cover Dromore (County Down) (BT25) and nearby places including Donaghcloney, Moira and Waringstown, plus the rest of County Down. The first site visit is free.
Which side should the two-storey part go on?
Usually the side furthest from the nearest neighbour's windows, so the single-storey part sits nearest them and keeps their light. Other factors are where the stairs land upstairs, which room needs the extra space and where drains run. We sketch options at the design stage and explain which is most likely to be approved.
Can the single-storey part be deeper than the two-storey part?
With planning permission, yes, and that is often the point of the design: the ground floor projects further into the garden while the first floor stays back from neighbours. Under permitted development, the depth limits for extensions of more than one storey can apply to the whole extension, so we confirm which route applies before drawings are finalised.
Nearby
The same service in neighbouring towns:
Other extensions in Dromore (County Down)
- Rear
- Side
- Wraparound
- Over a garage
- First floor
- Semi-detached
- Detached
- Kitchen and bedrooms
- Bedroom and en-suite
All two-storey extension services in Dromore (County Down) · Part single, part two-storey extensions across County Down
Want a figure first? Try our guide price tool, then book a free visit to firm it up.