East Sussex · England

Party wall notices for extensions in East Sussex

Our party wall service covers the whole of East Sussex. Choose your town below, or get in touch to talk your project through.

East Sussex at a glance

Nation
England
Price region
South East England
Postcode areas
BN, TN
Towns covered
15 listed below, plus surrounding villages
Site visits
Free, no obligation

What a party wall notice involves

A party wall notice is a formal written notice that you must give your neighbours under the Party Wall etc. For a two-storey extension it usually covers building a new wall on the boundary, cutting beams into a shared wall or digging foundations near a neighbour's.

Across East Sussex we cover Brighton (BN1), Eastbourne (BN20), Hastings (TN31), Hove (BN3), Bexhill-on-Sea (TN33) and Hailsham (BN26), plus the smaller places around them.

Fees

We confirm every fee in writing before the design stage starts; typical professional fees are on our prices page.

Rules in England

In England, the Party Wall etc. Act 1996 applies. Notices are needed for a new wall on the boundary (1 month), work to a party wall (2 months) and nearby excavation (1 month). If a neighbour dissents, surveyors settle the terms; one agreed surveyor typically costs £1,300–£1,500 plus VAT, normally paid by the building owner.

Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.

Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.

Getting the design right

Building the timing in

Notice periods add to the programme, and a dissent can add more while surveyors agree the terms. We serve notices once the design and foundations are known, usually while planning is being decided, so they run in parallel with other approvals.

Talking to neighbours first

A conversation before the notice arrives often makes the difference between consent and dissent. We explain the work, share the drawings and answer questions, so neighbours know what to expect and are more likely to agree.

How we work in East Sussex

  1. Visit and first ideas

    One of our team visits your house in East Sussex, checks the walls, roof and drains, and sketches out options with you.

  2. Drawings and permission

    Our designers produce plans and elevations, then we take care of planning or permitted development checks with the council covering East Sussex.

  3. Structure and building control

    A structural engineer sizes the foundations and steels, and we get building regulations approval before work starts.

  4. Build and sign-off

    Vetted teams working under S&K build the extension, and we arrange the building control completion certificate at the end.

Towns we cover in East Sussex

Party wall notices for extensions in East Sussex: questions

What happens if my neighbour does not respond to a party wall notice?

For a party structure notice or an excavation notice, a neighbour who does not respond within 14 days is treated as having dissented. Surveyors are then appointed to agree a party wall award, which sets out how the work will be done and records the condition of the neighbour's property. Either one agreed surveyor or one for each side can act.

Can my neighbour stop my extension with the Party Wall Act?

No. The Party Wall etc. Act 1996 sets out how work is done and how neighbours are protected, but it does not let them block lawful work that has planning approval or is permitted development. It can delay the start if notices are served late, which is why we serve them early.

Neighbouring areas

All extension services in East Sussex · About party wall notices for extensions

Ready to see what a second storey could do for your home?

Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.

CallGuide price