Gwent · Wales

Party wall notices for extensions in Gwent

Looking for help with party wall notices in Gwent? Here's what's involved, the rules in Wales and what it typically costs.

Gwent at a glance

Nation
Wales
Price region
Wales
Postcode areas
CF, NP
Towns covered
27 listed below, plus surrounding villages
Site visits
Free, no obligation

What a party wall notice involves

A party wall notice is a formal written notice that you must give your neighbours under the Party Wall etc. For a two-storey extension it usually covers building a new wall on the boundary, cutting beams into a shared wall or digging foundations near a neighbour's.

Across Gwent we cover Newport (Gwent) (NP10), Cwmbran (NP44), Pontypool (NP4), Ebbw Vale (NP23), Caerphilly (CF83) and Risca (NP11), plus the smaller places around them.

Fees

We confirm every fee in writing before the design stage starts; typical professional fees are on our prices page.

Rules in Wales

In Wales, the Party Wall etc. Act 1996 applies in the same way as in England. Notices are needed for a new wall on the line of junction, work to a party wall and excavation near a neighbour's foundations, with the same 1 month and 2 month periods. One agreed surveyor typically costs £1,300–£1,500 plus VAT.

Approval in Wales: Householder planning application: £585. Councils normally decide householder applications within 8 weeks.

Building regulations: Building regulations approval under the Welsh Approved Documents, which differ from England's in places (notably energy efficiency).

Getting the design right

Building the timing in

Notice periods add to the programme, and a dissent can add more while surveyors agree the terms. We serve notices once the design and foundations are known, usually while planning is being decided, so they run in parallel with other approvals.

Talking to neighbours first

A conversation before the notice arrives often makes the difference between consent and dissent. We explain the work, share the drawings and answer questions, so neighbours know what to expect and are more likely to agree.

How we work in Gwent

  1. Visit and first ideas

    One of our team visits your house in Gwent, checks the walls, roof and drains, and sketches out options with you.

  2. Plans, then approval

    Measured survey, design, then the right approval route for your house. We explain each step before we take it.

  3. Price it properly

    Once the engineer's calculations are in, we fix the build price in writing, with a clear list of what's included.

  4. Build and sign-off

    Vetted teams working under S&K build the extension, and we arrange the building control completion certificate at the end.

Towns we cover in Gwent

Party wall notices for extensions in Gwent: questions

What happens if my neighbour does not respond to a party wall notice?

For a party structure notice or an excavation notice, a neighbour who does not respond within 14 days is treated as having dissented. Surveyors are then appointed to agree a party wall award, which sets out how the work will be done and records the condition of the neighbour's property. Either one agreed surveyor or one for each side can act.

Can my neighbour stop my extension with the Party Wall Act?

No. The Party Wall etc. Act 1996 sets out how work is done and how neighbours are protected, but it does not let them block lawful work that has planning approval or is permitted development. It can delay the start if notices are served late, which is why we serve them early.

Neighbouring areas

All extension services in Gwent · About party wall notices for extensions

Ready to see what a second storey could do for your home?

Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.

CallGuide price