Planning permission for two-storey extensions in Cheshire
We handle a planning application for homeowners across Cheshire, from the first visit to the final paperwork.
Cheshire at a glance
- Nation
- England
- Price region
- North West England
- Postcode areas
- CH, CW, SK, WA
- Towns covered
- 20 listed below, plus surrounding villages
- Site visits
- Free, no obligation
What a planning application involves
Getting planning permission for a two-storey extension involves checking whether permitted development applies, preparing drawings and supporting information, submitting a householder application to the council and dealing with questions until a decision is made. Many two-storey extensions need permission, especially side, wraparound and front ones.
The main places we list in Cheshire are Warrington (WA1), Chester (CH2), Crewe (CW1), Ellesmere Port (CH65), Widnes (WA8) and Runcorn (WA6). We cover the villages in between too.
Fees
Planning drawings are a guide of £2,000–£3,500, priced in writing before the design stage starts. Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026).
Rules in England
In England, a householder planning application costs £548 (or £575 for applications made from 8 December 2026), and councils should decide within 8 weeks of validation. Two-storey side, wraparound and front extensions always need permission. Rear extensions may be permitted development within the 3 m and 7 m limits, confirmed with a lawful development certificate costing £274 (about £288 for applications from 8 December 2026).
Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.
Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.
The Party Wall etc. Act 1996 applies, so notices may be needed for work on or near a shared wall or boundary.
Getting the design right
A complete application
Applications that are missing drawings, the right fee or a certificate of ownership are not validated, and the decision clock does not start. We check the council's validation list so the application is complete on day one.
Design to local guidance
Most councils publish guidance on extensions covering set-backs, roof heights, boundary gaps and neighbours' light. Designing to it from the start makes approval more likely and reduces the chance of being asked to make changes during the application.
How we work in Cheshire
Start at your house
We come to your home in Cheshire, measure up, check the ground floor walls and roof structure, and note anything near the boundaries.
Plans, then approval
Measured survey, design, then the right approval route for your house. We explain each step before we take it.
Structure and building control
A structural engineer sizes the foundations and steels, and we get building regulations approval before work starts.
On site
One project lead runs the job, keeps you updated and arranges inspections at each stage until completion.
Towns we cover in Cheshire
- Warrington
- Chester
- Crewe
- Ellesmere Port
- Widnes
- Runcorn
- Macclesfield
- Northwich
- Great Sankey
- Winsford
- Congleton
- Wilmslow
- Sandbach
- Nantwich
- Neston (Cheshire)
- Poynton
- Middlewich
- Blacon
- Knutsford
- Lymm
Planning permission for two-storey extensions in Cheshire: questions
Should I get pre-application advice from the council?
It can help on sensitive sites, such as conservation areas, corner plots or front extensions, where the council's view is hard to predict. Many councils charge for it and response times vary. For straightforward designs that follow local guidance, a well prepared application is often the quicker route.
What happens if my planning application is refused?
You can change the design and apply again, or appeal. In England, a householder appeal must usually be made within 12 weeks of the decision. Often the best route is a revised design that answers the reasons for refusal. We read the officer's report and advise which option has the better chance.
Neighbouring areas
- Planning permission for two-storey extensions in Merseyside
- Planning permission for two-storey extensions in Greater Manchester
- Planning permission for two-storey extensions in Clwyd
- Planning permission for two-storey extensions in Staffordshire
All extension services in Cheshire · About planning permission for two-storey extensions
Ready to see what a second storey could do for your home?
Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.