Norfolk · England

Planning permission for two-storey extensions in Norfolk

Looking for help with a planning application in Norfolk? Here's what's involved, the rules in England and what it typically costs.

Norfolk at a glance

Nation
England
Price region
East of England
Postcode areas
IP, NR, PE
Towns covered
11 listed below, plus surrounding villages
Site visits
Free, no obligation

What a planning application involves

This service suits you if you want your two-storey extension to go through planning with the best chance of approval. You get a check of your house's planning history, permitted development rights and local design guidance, a design shaped around them, the application prepared and submitted, and someone to deal with the planning officer's questions. We cannot promise an outcome, but we design to give the application a fair chance.

The main places we list in Norfolk are Norwich (NR1), Great Yarmouth (NR29), King's Lynn (PE30), Thetford (IP24), Bowthorpe (NR5) and East Dereham (NR19). We cover the villages in between too.

Fees

Planning drawings are a guide of £2,000–£3,500, priced in writing before the design stage starts. Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026).

Rules in England

In England, a householder planning application costs £548 (or £575 for applications made from 8 December 2026), and councils should decide within 8 weeks of validation. Two-storey side, wraparound and front extensions always need permission. Rear extensions may be permitted development within the 3 m and 7 m limits, confirmed with a lawful development certificate costing £274 (about £288 for applications from 8 December 2026).

Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.

Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.

The Party Wall etc. Act 1996 applies, so notices may be needed for work on or near a shared wall or boundary.

Getting the design right

A complete application

Applications that are missing drawings, the right fee or a certificate of ownership are not validated, and the decision clock does not start. We check the council's validation list so the application is complete on day one.

Neighbours' light and privacy

The main concerns on a two-storey extension are usually loss of light, outlook and privacy for neighbours. We test the design against nearby windows and gardens, and adjust depth, roof shape or window positions before submitting.

How we work in Norfolk

  1. Measure and listen

    A visit to Norfolk to understand how you live in the house now and what the extra rooms need to do, plus a first look at the structure.

  2. Drawings and permission

    Our designers produce plans and elevations, then we take care of planning or permitted development checks with the council covering Norfolk.

  3. Technical design

    We prepare the building regulations drawings, structural calculations and specification so the build price can be fixed.

  4. Build and hand over

    We manage the build from groundworks to decoration-ready finish and hand over with the completion paperwork.

Towns we cover in Norfolk

Planning permission for two-storey extensions in Norfolk: questions

Should I get pre-application advice from the council?

It can help on sensitive sites, such as conservation areas, corner plots or front extensions, where the council's view is hard to predict. Many councils charge for it and response times vary. For straightforward designs that follow local guidance, a well prepared application is often the quicker route.

What happens if my planning application is refused?

You can change the design and apply again, or appeal. In England, a householder appeal must usually be made within 12 weeks of the decision. Often the best route is a revised design that answers the reasons for refusal. We read the officer's report and advise which option has the better chance.

Neighbouring areas

All extension services in Norfolk · About planning permission for two-storey extensions

Ready to see what a second storey could do for your home?

Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.

CallGuide price