Two-storey extensions for semi-detached houses in Lisburn
We plan and build two-storey extensions for semi-detached houses for homeowners in Lisburn and nearby. Every project starts with a free visit and a design stage priced in writing before any work begins.
Lisburn: the key facts for this kind of project.
- Postcode districts
- BT10, BT17, BT27 and BT28
- County / area
- County Antrim, Northern Ireland
- Price region
- Northern Ireland
- Guide price
- £49,500–£66,500 (£1,760–£2,380 per m²)
- Approval route
- Depends on position: a two-storey rear extension may be permitted development (3 m deep, 7 m from the rear boundary); most others need planning permission.
- Nearest towns
- Carryduff (6 miles), Belfast (6.7 miles), Castlereagh (7 miles)
- Distance to Belfast
- about 6.7 miles
- First visit
- Free, no obligation
About a two-storey extension for a semi-detached house
This service suits you if you own a semi-detached house and want to add bedrooms and living space without moving. On a semi, the main questions are which side to build on and how to treat the attached neighbour. You get a survey, design options, the approvals your nation needs and the build, carried out by vetted teams working under S&K.
We cover postcode districts BT10, BT17, BT27 and BT28 in and around Lisburn, along with neighbouring Carryduff, Belfast and Castlereagh.
What it costs in Lisburn
Our guide for Northern Ireland is £1,760–£2,380 per m² including VAT. On a project with a 4 m × 3.5 m footprint on two floors (28 m² of new floor space), that puts a two-storey extension for a semi-detached house in Lisburn at roughly £49,500–£66,500. The fastest way to a firmer number is a free site visit, after which we price the design stage in writing.
| Spec | Per m² | A 4 m × 3.5 m footprint on two floors (28 m² of new floor space) |
|---|---|---|
| Essential | £1,620–£2,190 per m² | £45,500–£61,000 |
| Standard | £1,760–£2,380 per m² | £49,500–£66,500 |
| Premium | £2,110–£2,850 per m² | £59,000–£80,000 |
Planning and building control in Lisburn
In Northern Ireland, a two-storey rear extension on a semi can be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary, with height, materials and roof pitch conditions. Upper side windows within 15 m of a boundary must be obscure and non-opening. A side extension normally needs planning, costing £347.
Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.
Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.
Design points for Lisburn homes
Keeping the pair balanced
Semis are designed as matching pairs, and a side extension changes that balance. Setting the side extension back from the front wall and keeping its ridge lower helps the pair still read as a pair, which councils' design guides commonly ask for.
The attached neighbour's light
A two-storey rear extension next to the party wall can take light from the neighbour's rear windows. Councils often use a 45-degree test, so the first floor may need to be shorter than the ground floor or set in from the shared boundary.
How we'd run your project
Understand the brief
At your home in Lisburn we agree what you need: bedroom count, bathroom, kitchen space, and how much garden you want to keep.
Get it approved
Once you're happy with the design we submit it to the council for Lisburn and deal with any questions from the planning officer.
Fixed price in writing
With approved drawings and calculations, we give you a fixed build price and a programme you can plan around.
Build
Foundations, walls, floor, roof, windows, then first and second fix. We break through into the house as late as we can.
Questions about two-storey extensions for semi-detached houses in Lisburn
Do I need planning permission for a two-storey extension for a semi-detached house in Lisburn?
Lisburn is in Northern Ireland. Depends on position: a two-storey rear extension may be permitted development (3 m deep, 7 m from the rear boundary); most others need planning permission.
Who handles building control for a project in Lisburn?
We handle it as part of the project. What's needed in Northern Ireland: building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.
How long does a two-storey extension for a semi-detached house take?
Allow 4 to 8 weeks for survey and design, then the approval period (councils aim to decide local applications within an average of 15 weeks; many take longer), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.
Will a side extension make my semi look like a terrace?
It can if it fills the whole gap to the boundary at first floor and the neighbour does the same. Many councils ask for a first-floor gap to the side boundary or a set-back for this reason. We design the extension to keep the semi reading as one of a pair.
Does a two-storey extension add value to a semi-detached house?
It usually adds value, but the gain is never certain. Nationwide's 2025 research found that 10% more floor area was linked to about 5% higher value, and that adding a double bedroom and bathroom to a three-bed, one-bathroom house could add up to 24%. Every street has a ceiling price, so check local sales first.
Nearby
The same service in neighbouring towns:
Other extensions in Lisburn
- Rear
- Side
- Wraparound
- Part two-storey
- Over a garage
- First floor
- Detached
- Kitchen and bedrooms
- Bedroom and en-suite
All two-storey extension services in Lisburn · Two-storey extensions for semi-detached houses across County Antrim
Send us your postcode and a few details. We'll get back to you to arrange a visit and talk through your options.