Cheshire · England

Two-storey extension plans and drawings in Cheshire

Looking for help with extension plans and drawings in Cheshire? Here's what's involved, the rules in England and what it typically costs.

Cheshire at a glance

Nation
England
Price region
North West England
Postcode areas
CH, CW, SK, WA
Towns covered
20 listed below, plus surrounding villages
Site visits
Free, no obligation

What a set of extension plans involves

This service suits you if you want clear, accurate plans for a two-storey extension, whether to apply for planning, check permitted development or get build prices. You get a measured survey, sketch options with guide costs, a chosen design developed into planning drawings and, if you go ahead, building regulations drawings coordinated with the structural engineer. Because we also build, the drawings are prepared with the build in mind.

The main places we list in Cheshire are Warrington (WA1), Chester (CH2), Crewe (CW1), Ellesmere Port (CH65), Widnes (WA8) and Runcorn (WA6). We cover the villages in between too.

Fees

Planning drawings (survey and design) are a guide of £2,000–£3,500 and building regulations drawings and specification £1,500–£4,000, with your design stage priced in writing before it starts.

Rules in England

In England, the plans support either a householder application, costing £548 (or £575 for applications made from 8 December 2026), or a lawful development certificate for permitted development, costing £274 (about £288 for applications from 8 December 2026). They must show the extension's relationship to the original house, the boundaries and neighbours, because two-storey rear permitted development depends on the 3 m and 7 m limits.

Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.

Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.

The Party Wall etc. Act 1996 applies, so notices may be needed for work on or near a shared wall or boundary.

Getting the design right

Start with a measured survey

Accurate drawings depend on accurate measurements of the house, the boundaries and neighbouring windows. We measure inside and out, note levels, drains and trees, and record the original house so permitted development limits can be checked against the right starting point.

Planning drawings versus building regulations drawings

Planning drawings show what the extension looks like and how it affects neighbours. Building regulations drawings show how it is built: foundations, structure, insulation, fire safety, ventilation and drainage. Most two-storey extensions need both, prepared at different stages.

How we work in Cheshire

  1. Start at your house

    We come to your home in Cheshire, measure up, check the ground floor walls and roof structure, and note anything near the boundaries.

  2. Plans, then approval

    Measured survey, design, then the right approval route for your house. We explain each step before we take it.

  3. Fixed price in writing

    With approved drawings and calculations, we give you a fixed build price and a programme you can plan around.

  4. Build it

    The new structure goes up first, then we open into the house, finish inside and get the completion certificate.

Towns we cover in Cheshire

Two-storey extension plans and drawings in Cheshire: questions

Do I own the plans once they are drawn?

You receive copies of the drawings to use for your project, including your planning application and building regulations approval. Copyright in drawings normally stays with whoever prepares them unless agreed otherwise. Your written design stage price sets out how the drawings can be used.

Do the plans include structural calculations?

Not at planning stage. Structural calculations and beam design are prepared by a structural engineer once the design is agreed, and they form part of the building regulations package. We coordinate the engineer's work with the drawings so steel sizes and floor depths match.

How long do extension plans take to prepare?

Survey, design and planning drawings usually take 4 to 8 weeks, depending on how many options you want to explore. Technical design, structural calculations and building control approval take a further 4 to 8 weeks, and this can overlap with the planning decision period.

Neighbouring areas

All extension services in Cheshire · About two-storey extension plans and drawings

Ready to see what a second storey could do for your home?

Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.

CallGuide price