Devon · England

Two-storey extension plans and drawings in Devon

Planning an extension in Devon? This is how our plans and drawings service works, with the England rules and typical fees.

Devon at a glance

Nation
England
Price region
South West England
Postcode areas
EX, PL, TQ
Towns covered
22 listed below, plus surrounding villages
Site visits
Free, no obligation

What a set of extension plans involves

Two-storey extension plans involve a measured survey of your house, design options, and a set of scaled drawings showing the existing and proposed floor plans, elevations, a site plan and a location plan. These are the drawings needed for a planning application or lawful development certificate. Building regulations drawings with construction details follow as a separate, more technical set.

Across Devon we cover Plymouth (PL1), Exeter (EX2), Paignton (TQ3), Torquay (TQ1), Newton Abbot (TQ11) and Exmouth (EX8), plus the smaller places around them.

Fees

Planning drawings (survey and design) are a guide of £2,000–£3,500 and building regulations drawings and specification £1,500–£4,000, with your design stage priced in writing before it starts.

Rules in England

In England, the plans support either a householder application, costing £548 (or £575 for applications made from 8 December 2026), or a lawful development certificate for permitted development, costing £274 (about £288 for applications from 8 December 2026). They must show the extension's relationship to the original house, the boundaries and neighbours, because two-storey rear permitted development depends on the 3 m and 7 m limits.

Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.

Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.

The Party Wall etc. Act 1996 applies, so notices may be needed for work on or near a shared wall or boundary.

Getting the design right

Planning drawings versus building regulations drawings

Planning drawings show what the extension looks like and how it affects neighbours. Building regulations drawings show how it is built: foundations, structure, insulation, fire safety, ventilation and drainage. Most two-storey extensions need both, prepared at different stages.

Compare options early

Sketching two or three layouts, such as rear, side or part two-storey, is the cheapest point to make big decisions. Each option comes with a guide cost and a view on the approval route, so you choose with the full picture rather than discovering limits later.

How we work in Devon

  1. Measure and listen

    A visit to Devon to understand how you live in the house now and what the extra rooms need to do, plus a first look at the structure.

  2. Get it approved

    Once you're happy with the design we submit it to the council for Devon and deal with any questions from the planning officer.

  3. Engineer it

    Foundations sized for two floors, steels for any openings, and building control approval, all before anyone starts on site.

  4. On site

    One project lead runs the job, keeps you updated and arranges inspections at each stage until completion.

Towns we cover in Devon

Two-storey extension plans and drawings in Devon: questions

How long do extension plans take to prepare?

Survey, design and planning drawings usually take 4 to 8 weeks, depending on how many options you want to explore. Technical design, structural calculations and building control approval take a further 4 to 8 weeks, and this can overlap with the planning decision period.

Do I own the plans once they are drawn?

You receive copies of the drawings to use for your project, including your planning application and building regulations approval. Copyright in drawings normally stays with whoever prepares them unless agreed otherwise. Your written design stage price sets out how the drawings can be used.

Do the plans include structural calculations?

Not at planning stage. Structural calculations and beam design are prepared by a structural engineer once the design is agreed, and they form part of the building regulations package. We coordinate the engineer's work with the drawings so steel sizes and floor depths match.

Neighbouring areas

All extension services in Devon · About two-storey extension plans and drawings

Ready to see what a second storey could do for your home?

Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.

CallGuide price