Two-storey front extensions in County Fermanagh
From first sketch to completion certificate, we deliver two-storey front extensions for homeowners across County Fermanagh.
County Fermanagh at a glance
- Nation
- Northern Ireland
- Price region
- Northern Ireland
- Postcode areas
- BT
- Towns covered
- 4 listed below, plus surrounding villages
- Approval route
- Planning permission is needed for anything built forward of the front wall.
- Site visits
- Free, no obligation
What a two-storey front extension involves
A two-storey front extension is an addition built forward of the front wall of your house on both floors, often a deeper hall or study below and a larger bedroom above. It suits houses set well back from the road.
Across County Fermanagh we cover Enniskillen (BT74), Lisnaskea (BT92), Irvinestown (BT93) and Ballinamallard (BT94), plus the smaller places around them.
Guide price in Northern Ireland
Our guide for Northern Ireland is £1,940–£2,640 per m² including VAT. On a project with a 3 m × 2 m footprint on two floors (12 m² of new floor space), that puts a two-storey front extension in County Fermanagh at roughly £23,000–£31,500. The fastest way to a firmer number is a free site visit, after which we price the design stage in writing.
| Spec | Per m² | Typical project |
|---|---|---|
| Essential | £1,780–£2,430 per m² | £21,500–£29,000 |
| Standard | £1,940–£2,640 per m² | £23,000–£31,500 |
| Premium | £2,320–£3,170 per m² | £28,000–£38,000 |
Rules in Northern Ireland
In Northern Ireland, the permitted development allowance for two-storey extensions is written for rear extensions, so a two-storey front extension needs a planning application. The fee is £347 per dwelling, and councils aim for an average of 15 weeks for local applications. Building control approval from the council under the Technical Booklets is also needed.
Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.
Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.
There is no Party Wall Act in Northern Ireland. Shared walls and boundaries are a matter of title and common law, so we agree access and record conditions with neighbours before work starts.
Getting the design right
Roof and gable design
A front extension is the most visible part of the house, so the roof needs to look deliberate: a matching gable, a hipped bay or a porch roof below a first-floor bay. We match the pitch and materials and keep the ridge below the main roof.
Parking and access
Building forward can reduce off-road parking and the space for bins and meters. Councils may weigh up parking, so we check the drive will still work, along with the routes for gas, electricity and water supplies that often enter at the front.
How we work in County Fermanagh
Visit and first ideas
One of our team visits your house in County Fermanagh, checks the walls, roof and drains, and sketches out options with you.
Drawings, then consent
We draw the scheme, check it against the rules in Northern Ireland, and take it through the right consent with the council.
Price it properly
Once the engineer's calculations are in, we fix the build price in writing, with a clear list of what's included.
On site
One project lead runs the job, keeps you updated and arranges inspections at each stage until completion.
Towns we cover in County Fermanagh
Two-storey front extensions in County Fermanagh: questions
How much does a two-storey front extension cost in County Fermanagh?
In Northern Ireland our guide is £1,940–£2,640 per m² including VAT, so about £23,000–£31,500 for a 3 m × 2 m footprint on two floors (12 m² of new floor space). Essential and Premium specs move that by roughly 8% down or 20% up.
How far forward can a front extension go?
There is no fixed figure, because a two-storey front extension needs planning permission and the council decides case by case. Many councils' design guides favour a shallow projection that keeps a clear front garden. Our guide prices assume a modest example with a 3 m × 2 m footprint on two floors (12 m² of new floor space).
Does a front extension affect my parking?
It can. If it is built over part of the drive you may lose a parking space, and some councils consider whether enough off-road parking remains. We measure the drive at the survey and show on the drawings how cars, bins and meters will fit after the work.
Will the council approve a two-storey front extension?
It depends on the street. Councils are more cautious about front extensions than rear ones because they change the street scene. Approval is more likely where the house is set back, the projection is modest, the design echoes the original house and similar additions already exist nearby. We give you a frank view at the free site visit.
Will I need planning permission in County Fermanagh?
County Fermanagh is in Northern Ireland. Planning permission is needed for anything built forward of the front wall.
Neighbouring areas
- Two-storey front extensions in County Tyrone
- Two-storey front extensions in County Armagh
- Two-storey front extensions in County Londonderry
- Two-storey front extensions in County Antrim
All extension services in County Fermanagh · About two-storey front extensions
Ready to see what a second storey could do for your home?
Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.