Forfar · Dundee and Angus

Two-storey rear extensions in Forfar

Thinking about a two-storey rear extension in Forfar? We design it, take it through the approvals it needs and build it, with one team responsible from the first visit to the final certificate.

Before you start in Forfar, here's what applies.

Postcode districts
DD8
County / area
Dundee and Angus, Scotland
Price region
Scotland
Guide price
£52,500–£71,000 (£1,880–£2,540 per m²)
Approval route
Planning permission is usually needed: Class 1B permitted development only applies if every part of the extension is at least 10 m from all boundaries. A building warrant is needed before work starts.
Nearest towns
Kirriemuir (4.8 miles), Brechin (10.6 miles), Monifieth (11.5 miles)
Distance to Dundee
about 12.5 miles
First visit
Free, no obligation

About a two-storey rear extension

A two-storey rear extension suits you if you need more room on both floors and have a reasonably deep garden. You get one team for the whole job: a measured survey, the design, a check on whether permitted development applies, planning drawings where they are needed, structural design, a building warrant and the build itself, carried out by vetted teams working under S&K. Every project starts with a free site visit.

Around Forfar we also work in Kirriemuir, Brechin and Monifieth, and across the rest of Dundee and Angus. Postcode district in and near Forfar: DD8.

What it costs in Forfar

In Scotland, which includes Forfar, we'd expect a two-storey rear extension to cost around £52,500–£71,000 for a 4 m × 3.5 m footprint on two floors (28 m² of new floor space), or £1,880–£2,540 per m² including VAT. The fastest way to a firmer number is a free site visit, after which we price the design stage in writing.

SpecPer m²A 4 m × 3.5 m footprint on two floors (28 m² of new floor space)
Essential£1,730–£2,330 per m²£48,500–£65,500
Standard£1,880–£2,540 per m²£52,500–£71,000
Premium£2,260–£3,050 per m²£63,000–£85,500

Planning and building standards in Forfar

In Scotland, a two-storey rear extension is only permitted development under Class 1B if no part of it is within 10 m of any boundary, it is no higher than the house and the house is not in a conservation area. Most gardens cannot meet the 10 m test, so expect a householder application (£371, decided within two months) and a building warrant before work starts.

Approval in Scotland: Householder planning application: £371. Councils have two months to decide a local planning application.

Building standards: A building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks.

Design points for Forfar homes

Depth and neighbours' light

Councils check that a two-storey rear extension does not take too much light or outlook from neighbouring windows, and many use a 45-degree line drawn from the nearest habitable window. We test this at sketch stage, so the depth you are shown is one that can realistically be approved.

Opening up the ground floor

Knocking through the old rear wall means steel beams to carry the first floor and roof above. The structural engineer sets the beam sizes, padstones and any posts, and we plan them early so the open-plan layout you want is the one that gets built.

How we'd run your project

  1. Understand the brief

    At your home in Forfar we agree what you need: bedroom count, bathroom, kitchen space, and how much garden you want to keep.

  2. Get it approved

    Once you're happy with the design we submit it to the council for Forfar and deal with any questions from the planning officer.

  3. Engineer it

    Foundations sized for two floors, steels for any openings, and a building warrant, all before anyone starts on site.

  4. On site

    One project lead runs the job, keeps you updated and arranges inspections at each stage until completion.

Questions about two-storey rear extensions in Forfar

Which postcodes do you cover around Forfar?

We cover Forfar (DD8) and nearby places including Kirriemuir, Brechin and Monifieth, plus the rest of Dundee and Angus. The first site visit is free.

How long does a two-storey rear extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils have two months to decide a local planning application), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Who handles building standards for a project in Forfar?

We handle it as part of the project. What's needed in Scotland: a building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.

Do I need planning permission for a two-storey rear extension in Forfar?

Forfar is in Scotland. Planning permission is usually needed: Class 1B permitted development only applies if every part of the extension is at least 10 m from all boundaries. A building warrant is needed before work starts.

Will a two-storey rear extension block my neighbour's light?

It can if it is too deep or too close to the boundary, which is why councils look closely at its effect on neighbouring windows and gardens. We test the design against light and outlook early, keep the first floor shorter or set in where needed, and use a hipped roof to reduce bulk on the boundary side.

Nearby

We also cover places near Forfar, including:

Other extensions in Forfar

All two-storey extension services in Forfar · Two-storey rear extensions across Dundee and Angus

Ready to talk it through? Call us or send the form and we'll arrange a visit to your home in Forfar.

CallGuide price