Two-storey rear extensions in Kirriemuir
A two-storey rear extension is one of the most space-efficient ways to add bedrooms and living space to a house in Kirriemuir, because the new floors share one set of foundations and one roof.
Useful details for planning a two-storey rear extension in Kirriemuir.
- Postcode districts
- DD8
- County / area
- Dundee and Angus, Scotland
- Price region
- Scotland
- Guide price
- £52,500–£71,000 (£1,880–£2,540 per m²)
- Approval route
- Planning permission is usually needed: Class 1B permitted development only applies if every part of the extension is at least 10 m from all boundaries. A building warrant is needed before work starts.
- Nearest towns
- Forfar (4.8 miles), Brechin (13.7 miles), Blairgowrie and Rattray (14 miles)
- Distance to Dundee
- about 14.2 miles
- First visit
- Free, no obligation
About a two-storey rear extension
A two-storey rear extension is a new two-floor addition built onto the back of your house, usually giving a larger kitchen or living space on the ground floor and one or two bedrooms or a bathroom above. Because both floors share one set of foundations and one roof, it adds a lot of floor space for the garden it uses. In some cases it can be built under permitted development, depending on where you live.
We cover postcode district DD8 in and around Kirriemuir, along with neighbouring Forfar, Brechin and Blairgowrie and Rattray.
What it costs in Kirriemuir
Most of the cost of a two-storey rear extension is set by its size and specification. For Kirriemuir and the rest of Scotland, our guide is £1,880–£2,540 per m² including VAT, so about £52,500–£71,000 for a 4 m × 3.5 m footprint on two floors (28 m² of new floor space). Keep a contingency of around 10% for things nobody can see until the ground is opened up.
| Spec | Per m² | A 4 m × 3.5 m footprint on two floors (28 m² of new floor space) |
|---|---|---|
| Essential | £1,730–£2,330 per m² | £48,500–£65,500 |
| Standard | £1,880–£2,540 per m² | £52,500–£71,000 |
| Premium | £2,260–£3,050 per m² | £63,000–£85,500 |
Planning and building standards in Kirriemuir
In Scotland, a two-storey rear extension is only permitted development under Class 1B if no part of it is within 10 m of any boundary, it is no higher than the house and the house is not in a conservation area. Most gardens cannot meet the 10 m test, so expect a householder application (£371, decided within two months) and a building warrant before work starts.
Approval in Scotland: Householder planning application: £371. Councils have two months to decide a local planning application.
Building standards: A building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks.
Design points for Kirriemuir homes
Foundations and drains
Foundations for two storeys carry more load than a single storey and may need to go deeper near trees or on clay. Rear extensions often sit near drains, so we check sewer records early, as building over or near a public sewer may need the water company's agreement.
Opening up the ground floor
Knocking through the old rear wall means steel beams to carry the first floor and roof above. The structural engineer sets the beam sizes, padstones and any posts, and we plan them early so the open-plan layout you want is the one that gets built.
How we'd run your project
Free site visit
We visit your home in Kirriemuir, look at the structure, access and boundaries, and talk through what you want the new rooms to do.
Choose the approval route
Some designs fit permitted development, most need a householder application. We decide which applies in Scotland before drawing in detail.
Engineer it
Foundations sized for two floors, steels for any openings, and a building warrant, all before anyone starts on site.
Build and hand over
We manage the build from groundworks to decoration-ready finish and hand over with the completion paperwork.
Questions about two-storey rear extensions in Kirriemuir
How long does a two-storey rear extension take?
Allow 4 to 8 weeks for survey and design, then the approval period (councils have two months to decide a local planning application), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.
Do I need planning permission for a two-storey rear extension in Kirriemuir?
Kirriemuir is in Scotland. Planning permission is usually needed: Class 1B permitted development only applies if every part of the extension is at least 10 m from all boundaries. A building warrant is needed before work starts.
Which postcodes do you cover around Kirriemuir?
We cover Kirriemuir (DD8) and nearby places including Forfar, Brechin and Blairgowrie and Rattray, plus the rest of Dundee and Angus. The first site visit is free.
Who handles building standards for a project in Kirriemuir?
We handle it as part of the project. What's needed in Scotland: a building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.
Will a two-storey rear extension block my neighbour's light?
It can if it is too deep or too close to the boundary, which is why councils look closely at its effect on neighbouring windows and gardens. We test the design against light and outlook early, keep the first floor shorter or set in where needed, and use a hipped roof to reduce bulk on the boundary side.
Nearby
Close to Kirriemuir? We work across the area, including:
Other extensions in Kirriemuir
- Side
- Wraparound
- Part two-storey
- Over a garage
- First floor
- Semi-detached
- Detached
- Kitchen and bedrooms
- Bedroom and en-suite
All two-storey extension services in Kirriemuir · Two-storey rear extensions across Dundee and Angus