Two-storey rear extensions in Kinross
Homes in Kinross with a bit of space to the side or rear can often take a two-storey rear extension. We'll tell you honestly whether yours can, and what approvals it needs.
Useful details for planning a two-storey rear extension in Kinross.
- Postcode districts
- KY13
- County / area
- Perth and Kinross, Scotland
- Price region
- Scotland
- Guide price
- £52,500–£71,000 (£1,880–£2,540 per m²)
- Approval route
- Planning permission is usually needed: Class 1B permitted development only applies if every part of the extension is at least 10 m from all boundaries. A building warrant is needed before work starts.
- Nearest towns
- Ballingry (4.6 miles), Kelty (5.1 miles), Lochgelly (6.8 miles)
- Distance to Perth
- about 13.2 miles
- First visit
- Free, no obligation
About a two-storey rear extension
A two-storey rear extension is a new two-floor addition built onto the back of your house, usually giving a larger kitchen or living space on the ground floor and one or two bedrooms or a bathroom above. Because both floors share one set of foundations and one roof, it adds a lot of floor space for the garden it uses. In some cases it can be built under permitted development, depending on where you live.
Kinross sits about 13.2 miles from Perth. Closer to home, Ballingry is 4.6 miles away and Kelty 5.1 miles.
What it costs in Kinross
For budgeting in Kinross, allow around £52,500–£71,000 for a two-storey rear extension with a 4 m × 3.5 m footprint on two floors (28 m² of new floor space). That's based on £1,880–£2,540 per m² including VAT for Scotland. Design fees, structural calculations and approval fees are separate and listed on our prices page.
| Spec | Per m² | A 4 m × 3.5 m footprint on two floors (28 m² of new floor space) |
|---|---|---|
| Essential | £1,730–£2,330 per m² | £48,500–£65,500 |
| Standard | £1,880–£2,540 per m² | £52,500–£71,000 |
| Premium | £2,260–£3,050 per m² | £63,000–£85,500 |
Planning and building standards in Kinross
In Scotland, a two-storey rear extension is only permitted development under Class 1B if no part of it is within 10 m of any boundary, it is no higher than the house and the house is not in a conservation area. Most gardens cannot meet the 10 m test, so expect a householder application (£371, decided within two months) and a building warrant before work starts.
Approval in Scotland: Householder planning application: £371. Councils have two months to decide a local planning application.
Building standards: A building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks.
Design points for Kinross homes
Opening up the ground floor
Knocking through the old rear wall means steel beams to carry the first floor and roof above. The structural engineer sets the beam sizes, padstones and any posts, and we plan them early so the open-plan layout you want is the one that gets built.
Foundations and drains
Foundations for two storeys carry more load than a single storey and may need to go deeper near trees or on clay. Rear extensions often sit near drains, so we check sewer records early, as building over or near a public sewer may need the water company's agreement.
How we'd run your project
Start at your house
We come to your home in Kinross, measure up, check the ground floor walls and roof structure, and note anything near the boundaries.
Get it approved
Once you're happy with the design we submit it to the council for Kinross and deal with any questions from the planning officer.
Technical design
We prepare the building warrant drawings, structural calculations and specification so the build price can be fixed.
Build and hand over
We manage the build from groundworks to decoration-ready finish and hand over with the completion paperwork.
Questions about two-storey rear extensions in Kinross
Do I need planning permission for a two-storey rear extension in Kinross?
Kinross is in Scotland. Planning permission is usually needed: Class 1B permitted development only applies if every part of the extension is at least 10 m from all boundaries. A building warrant is needed before work starts.
How long does a two-storey rear extension take?
Allow 4 to 8 weeks for survey and design, then the approval period (councils have two months to decide a local planning application), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.
Which postcodes do you cover around Kinross?
We cover Kinross (KY13) and nearby places including Ballingry, Kelty and Lochgelly, plus the rest of Perth and Kinross. The first site visit is free.
Who handles building standards for a project in Kinross?
We handle it as part of the project. What's needed in Scotland: a building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.
Will a two-storey rear extension block my neighbour's light?
It can if it is too deep or too close to the boundary, which is why councils look closely at its effect on neighbouring windows and gardens. We test the design against light and outlook early, keep the first floor shorter or set in where needed, and use a hipped roof to reduce bulk on the boundary side.
Nearby
Close to Kinross? We work across the area, including:
Other extensions in Kinross
- Side
- Wraparound
- Part two-storey
- Over a garage
- First floor
- Semi-detached
- Detached
- Kitchen and bedrooms
- Bedroom and en-suite
All two-storey extension services in Kinross · Two-storey rear extensions across Perth and Kinross
Ready to talk it through? Call us or send the form and we'll arrange a visit to your home in Kinross.