Two-storey wraparound extensions in Wrexham
Adding a two-storey wraparound extension in Wrexham gives you two new rooms stacked on one footprint. Here's how we'd approach it, what it typically costs and the rules that apply in Wales.
What we'd confirm first for a project in Wrexham.
- Postcode districts
- LL13
- County / area
- Clwyd, Wales
- Price region
- Wales
- Guide price
- £111,000–£152,000 (£1,980–£2,710 per m²)
- Approval route
- Usually needs planning permission, because the combined side and rear works rarely meet every permitted development test.
- Nearest towns
- Gresford (2.8 miles), Coedpoeth (3 miles), Brymbo (3.4 miles)
- First visit
- Free, no obligation
About a two-storey wraparound extension
A two-storey wraparound extension suits a house with space both beside it and behind it, where you want to transform the layout rather than add a single room. You get one design for the whole L-shape, the planning application, structural design for the corner and the openings into the house, building regulations approval and the build, managed by us and carried out by vetted teams working under S&K.
Around Wrexham we also work in Gresford, Coedpoeth and Brymbo, and across the rest of Clwyd. Postcode district in and near Wrexham: LL13.
What it costs in Wrexham
Most of the cost of a two-storey wraparound extension is set by its size and specification. For Wrexham and the rest of Wales, our guide is £1,980–£2,710 per m² including VAT, so about £111,000–£152,000 for an L-shaped footprint of about 28 m² wrapping the side and rear, on two floors (56 m² of new floor space). The fastest way to a firmer number is a free site visit, after which we price the design stage in writing.
| Spec | Per m² | An L-shaped footprint of about 28 m² wrapping the side and rear, on two floors (56 m² of new floor space) |
|---|---|---|
| Essential | £1,820–£2,500 per m² | £102,000–£140,000 |
| Standard | £1,980–£2,710 per m² | £111,000–£152,000 |
| Premium | £2,370–£3,260 per m² | £133,000–£182,500 |
Planning and building regulations in Wrexham
In Wales, a wraparound would have to pass both the side and rear tests to be permitted development: 10.5 m to the opposite side boundary, a 1 m set-back from the front and no more than 50% added width, plus the 4 m and 3 m rear depth limits and 10.5 m to the rear boundary. Many wraparounds therefore need a householder application, which costs £585.
Approval in Wales: Householder planning application: £585. Councils normally decide householder applications within 8 weeks.
Building regulations: Building regulations approval under the Welsh Approved Documents, which differ from England's in places (notably energy efficiency).
Design points for Wrexham homes
Daylight to the middle
A deep L-shaped plan can leave the middle of the ground floor dark, because the old rear rooms are now enclosed. We use wide rear openings, a well-placed stair and, where part of the extension is single storey, roof lights, while keeping total glazing within the Part L allowance.
Two roofs that meet
A wraparound needs the side roof and rear roof to join cleanly, often with a valley or hip where they meet. Getting pitches and ridge heights right keeps rainwater moving and avoids a bulky mass at the back corner, which neighbours and planners notice.
How we'd run your project
Measure and listen
A visit to Wrexham to understand how you live in the house now and what the extra rooms need to do, plus a first look at the structure.
Design and approvals
We draw the extension and check it against the rules for Wales, then apply for planning permission or a certificate of lawfulness, whichever fits.
Fixed price in writing
With approved drawings and calculations, we give you a fixed build price and a programme you can plan around.
Finish and certify
Second fix, plastering and making good, then building control's final inspection and the completion paperwork.
Questions about two-storey wraparound extensions in Wrexham
How long does a two-storey wraparound extension take?
Allow 4 to 8 weeks for survey and design, then the approval period (councils normally decide householder applications within 8 weeks), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.
Who handles building regulations for a project in Wrexham?
We handle it as part of the project. What's needed in Wales: building regulations approval under the Welsh Approved Documents, which differ from England's in places (notably energy efficiency). We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.
Do I need planning permission for a two-storey wraparound extension in Wrexham?
Wrexham is in Wales, so Wales planning rules apply. Usually needs planning permission, because the combined side and rear works rarely meet every permitted development test. If in doubt, a lawful development certificate or a planning application gives you certainty before you build.
Can a wraparound extension be part single, part two-storey?
Yes. Many wraparounds keep the rear part single storey with roof lights over the kitchen and put the two-storey part to the side. This can reduce the effect on neighbours and the cost. We set out both options at the design stage, so you can compare floor space against price before choosing.
Is a wraparound extension better than separate side and rear extensions?
Building both at once usually costs less than two separate projects, because you pay for one set-up, one scaffold, one roof junction and one set of approvals. It also lets the layout be designed as a whole. The trade-off is a larger single outlay and a longer build, often 16 to 24 weeks at this size.
Nearby
Other towns near Wrexham:
Other extensions in Wrexham
- Rear
- Side
- Part two-storey
- Over a garage
- First floor
- Semi-detached
- Detached
- Kitchen and bedrooms
- Bedroom and en-suite
All two-storey extension services in Wrexham · Two-storey wraparound extensions across Clwyd
Book a free site visit in Wrexham and we'll tell you what's possible, what approvals you need and what the design stage would cost.