Lochgelly · Fife

First-floor extensions in Lochgelly

Thinking about a first-floor extension in Lochgelly? We design it, take it through the approvals it needs and build it, with one team responsible from the first visit to the final certificate.

Useful details for planning a first-floor extension in Lochgelly.

Postcode districts
KY5
County / area
Fife, Scotland
Price region
Scotland
Guide price
£23,500–£34,000 (£1,690–£2,440 per m²)
Approval route
Planning permission is usually needed: Class 1B permitted development only applies if every part of the extension is at least 10 m from all boundaries. A building warrant is needed before work starts.
Nearest towns
Cowdenbeath (1.7 miles), Ballingry (2.6 miles), Kelty (3 miles)
Distance to Dunfermline
about 7 miles
First visit
Free, no obligation

About a first-floor extension

A first-floor extension is a new upstairs room built on top of an existing single-storey part of your house, such as a rear kitchen extension, a utility or a side annexe. It adds a bedroom, bathroom or study without enlarging the footprint. Whether it works depends mainly on whether the walls and foundations below can carry the extra load.

We cover Lochgelly (KY5) and the places around it, including Cowdenbeath (1.7 miles), Ballingry (2.6 miles) and Kelty.

What it costs in Lochgelly

For budgeting in Lochgelly, allow around £23,500–£34,000 for a first-floor extension with 4 m × 3.5 m of new first-floor space (14 m²). That's based on £1,690–£2,440 per m² including VAT for Scotland. Design fees, structural calculations and approval fees are separate and listed on our prices page.

SpecPer m²4 m × 3.5 m of new first-floor space (14 m²)
Essential£1,560–£2,250 per m²£22,000–£31,500
Standard£1,690–£2,440 per m²£23,500–£34,000
Premium£2,030–£2,930 per m²£28,500–£41,000

Planning and building standards in Lochgelly

In Scotland, permitted development for extensions of more than one storey (Class 1B) needs at least 10 m to every boundary and no part higher than the house. Most first-floor extensions cannot meet the 10 m test, so plan for a householder application (£371, decided within two months) and a building warrant before work starts.

Approval in Scotland: Householder planning application: £371. Councils have two months to decide a local planning application.

Building standards: A building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks.

Design points for Lochgelly homes

Escape and fire safety

A new first-floor bedroom needs an escape window with a clear opening of at least 0.33 m², at least 450 mm wide and 450 mm high, with the bottom no more than 1,100 mm above the floor, unless there is a protected route to the stairs.

Replacing the flat roof

The existing roof usually comes off and is replaced by a new first-floor structure. The room below is exposed for a short time, so we plan temporary weatherproofing and sequence the work to keep the kitchen or living room usable for as long as possible.

How we'd run your project

  1. Start at your house

    We come to your home in Lochgelly, measure up, check the ground floor walls and roof structure, and note anything near the boundaries.

  2. Get it approved

    Once you're happy with the design we submit it to the council for Lochgelly and deal with any questions from the planning officer.

  3. Structure and building standards

    A structural engineer sizes the foundations and steels, and we get a building warrant before work starts.

  4. Build

    Foundations, walls, floor, roof, windows, then first and second fix. We break through into the house as late as we can.

Questions about first-floor extensions in Lochgelly

How much does a first-floor extension cost in Lochgelly?

Our guide for Scotland, which covers Lochgelly, is £1,690–£2,440 per m² including VAT. A typical project with 4 m × 3.5 m of new first-floor space (14 m²) comes to about £23,500–£34,000. Design and approval fees are extra, and we fix the build price in writing once the design is agreed.

Which postcodes do you cover around Lochgelly?

We cover Lochgelly (KY5) and nearby places including Cowdenbeath, Ballingry and Kelty, plus the rest of Fife. The first site visit is free.

How long does a first-floor extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils have two months to decide a local planning application), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

What happens to the room below while the first floor is built?

The old roof is removed, so the room below is exposed for a short period. We fit temporary weather protection, plan the work so the roof comes off only when the new structure is ready, and agree with you which rooms will be out of use and for roughly how long.

Can I build on top of my existing single-storey extension?

Often yes, but only after the structure has been checked. Foundations, walls and lintels built for one storey may not carry two. We dig trial holes, look for the original a building warrant and ask the structural engineer to confirm what can stay, what needs strengthening and what must be rebuilt.

Nearby

Nearby towns we cover for first-floor extensions:

Other extensions in Lochgelly

All two-storey extension services in Lochgelly · First-floor extensions across Fife

Want a figure first? Try our guide price tool, then book a free visit to firm it up.