Kitchen extensions with bedrooms above in Milford Haven
We cover Milford Haven and the rest of Dyfed for kitchen extensions with bedrooms above. Start with a free site visit and a plain-English view of what your house and plot can take.
The basics for Milford Haven at a glance.
- Postcode districts
- SA73
- County / area
- Dyfed, Wales
- Price region
- Wales
- Guide price
- £51,500–£69,500 (£1,840–£2,480 per m²), kitchen units and worktops priced separately
- Approval route
- It may be permitted development if the ground floor goes no more than 4 m and the first floor no more than 3 m beyond the original rear wall, with the first floor 10.5 m from the rear boundary.
- Nearest towns
- Steynton (1.3 miles), Neyland (3.5 miles), Pembroke Dock (4.3 miles)
- Distance to Llanelli
- about 37.4 miles
- First visit
- Free, no obligation
About a kitchen extension with bedrooms above
A kitchen extension with bedrooms above is a two-storey extension designed so the ground floor becomes a larger, usually open-plan kitchen and dining space, with one or two bedrooms or a bathroom on the first floor. It is a natural fit for a two-storey rear extension. The key design issues are the steel beams that open up the house, glazing and ventilation.
Milford Haven sits about 37.4 miles from Llanelli. Closer to home, Steynton is 1.3 miles away and Neyland 3.5 miles.
What it costs in Milford Haven
In Wales, which includes Milford Haven, we'd expect a kitchen extension with bedrooms above to cost around £51,500–£69,500 (kitchen units and worktops priced separately) for a 4 m × 3.5 m footprint on two floors (28 m² of new floor space), or £1,840–£2,480 per m² including VAT. Design fees, structural calculations and approval fees are separate and listed on our prices page.
| Spec | Per m² | A 4 m × 3.5 m footprint on two floors (28 m² of new floor space) |
|---|---|---|
| Essential | £1,690–£2,290 per m² | £47,500–£64,000 |
| Standard | £1,840–£2,480 per m² | £51,500–£69,500 |
| Premium | £2,210–£2,980 per m² | £62,000–£83,500 |
Planning and building regulations in Milford Haven
In Wales, a kitchen extension with bedrooms above can be permitted development if the kitchen goes no more than 4 m and the first floor no more than 3 m beyond the original rear wall, with the first floor 10.5 m from the rear boundary. This lets the kitchen project further than the bedrooms. Otherwise a householder application costs £585.
Approval in Wales: Householder planning application: £585. Councils normally decide householder applications within 8 weeks.
Building regulations: Building regulations approval under the Welsh Approved Documents, which differ from England's in places (notably energy efficiency).
Design points for Milford Haven homes
Steel beams and the open-plan opening
Removing the old rear wall to make one large room means a steel beam, sometimes several, to carry the first floor and roof. The engineer sizes the steel and its supports, and we decide early whether you want a flush ceiling with the beam hidden or a downstand, as this affects ceiling heights.
Services and drainage
Sinks, dishwashers and an upstairs bathroom all need waste routes to the drains, often near where the extension goes. We check the drains early and plan soil stacks, gas and electrical supplies so the kitchen layout is not limited later.
How we'd run your project
Measure and listen
A visit to Milford Haven to understand how you live in the house now and what the extra rooms need to do, plus a first look at the structure.
Drawings, then consent
We draw the scheme, check it against the rules in Wales, and take it through the right consent with the council.
Fixed price in writing
With approved drawings and calculations, we give you a fixed build price and a programme you can plan around.
Build and hand over
We manage the build from groundworks to decoration-ready finish and hand over with the completion paperwork.
Questions about kitchen extensions with bedrooms above in Milford Haven
Which postcodes do you cover around Milford Haven?
We cover Milford Haven (SA73) and nearby places including Steynton, Neyland and Pembroke Dock, plus the rest of Dyfed. The first site visit is free.
How long does a kitchen extension with bedrooms above take?
Allow 4 to 8 weeks for survey and design, then the approval period (councils normally decide householder applications within 8 weeks), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.
Do I need planning permission for a kitchen extension with bedrooms above in Milford Haven?
Milford Haven is in Wales, so Wales planning rules apply. It may be permitted development if the ground floor goes no more than 4 m and the first floor no more than 3 m beyond the original rear wall, with the first floor 10.5 m from the rear boundary. If in doubt, a lawful development certificate or a planning application gives you certainty before you build.
Can the kitchen be bigger than the bedrooms above it?
Yes. With planning permission, the ground floor can extend further than the first floor, giving a part single, part two-storey design. In Wales, permitted development allows the ground floor to go 4 m and the first floor 3 m beyond the original rear wall. We show both options at the design stage.
Can I keep using my kitchen during the build?
For part of it. The new structure can be built while your existing kitchen stays in use, but when the rear wall is opened and the new kitchen is fitted there will be several weeks without one. We plan when this happens and help you set up a temporary kitchen elsewhere in the house.
Nearby
The same service in neighbouring towns:
Other extensions in Milford Haven
All two-storey extension services in Milford Haven · Kitchen extensions with bedrooms above across Dyfed
Ready to talk it through? Call us or send the form and we'll arrange a visit to your home in Milford Haven.