Structural engineering for two-storey extensions in Lincolnshire
We handle structural engineering for homeowners across Lincolnshire, from the first visit to the final paperwork.
Lincolnshire at a glance
- Nation
- England
- Price region
- East Midlands
- Postcode areas
- DN, LN, NG, PE
- Towns covered
- 17 listed below, plus surrounding villages
- Site visits
- Free, no obligation
What a structural design involves
This service suits every two-storey extension, because each one needs foundations sized for two storeys and usually steel beams where walls are removed. You get a structural engineer's calculations and drawings for beams, padstones, lintels, foundations and connections, coordinated with the architectural drawings, submitted for building control and followed through on site by our build teams.
Lincolnshire towns we list: Lincoln (LN1), Grimsby (DN31), Scunthorpe (DN15), Boston (PE20), Grantham (NG31) and Cleethorpes (DN35). Every other address in Lincolnshire is covered as well.
Fees
A structural engineer (calculations and beam design) is a guide of £750–£2,200, priced in writing once the design is known.
Rules in England
In England, structural engineering is part of building regulations approval under Part A rather than planning. The engineer's calculations go to council building control or a registered building control approver with the full plans application. Where more than one contractor is involved, the Building Safety Act dutyholder rules also apply.
Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.
Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.
The Party Wall etc. Act 1996 applies, so notices may be needed for work on or near a shared wall or boundary.
Getting the design right
Tying into the house
The new walls and floors are tied into the existing house with wall ties, restraint straps and joist hangers. The engineer also considers movement between the old and new foundations and where a movement joint may be needed.
Foundations for two storeys
Two storeys put more load on the ground than one, so foundations are usually deeper or wider. Clay soil, nearby trees, drains and made-up ground can all mean deeper trench fill or piles, which is why we dig trial holes before fixing the design.
How we work in Lincolnshire
Measure and listen
A visit to Lincolnshire to understand how you live in the house now and what the extra rooms need to do, plus a first look at the structure.
Drawings, then consent
We draw the scheme, check it against the rules in England, and take it through the right consent with the council.
Technical design
We prepare the building regulations drawings, structural calculations and specification so the build price can be fixed.
Build and sign-off
Vetted teams working under S&K build the extension, and we arrange the building control completion certificate at the end.
Towns we cover in Lincolnshire
- Lincoln
- Grimsby
- Scunthorpe
- Boston
- Grantham
- Cleethorpes
- Spalding
- Skegness
- Stamford
- Gainsborough
- Louth
- Sleaford
- Bourne
- Market Deeping
- Mablethorpe
- Barton-upon-Humber
- Immingham
Structural engineering for two-storey extensions in Lincolnshire: questions
Can a steel beam be hidden in the ceiling?
Often, yes. A beam can sit within the floor depth so the ceiling is flat, but that may mean a deeper steel section or a different floor structure. Otherwise it shows as a downstand below the ceiling. We discuss the options with you and the engineer before the design is fixed.
How deep do foundations need to be for a two-storey extension?
There is no single depth. It depends on the soil, nearby trees, drains and the loads. On firm ground foundations may be around a metre deep, while clay near trees can need much deeper trench fill or piles. Trial holes and the engineer's design set the depth, and building control inspects the trenches.
Do I need a structural engineer for a two-storey extension?
Almost always. Building control needs calculations showing that the foundations, beams and walls can carry the loads of two storeys and a roof. A two-storey extension usually involves removing part of an outside wall and new steel, which needs an engineer's design.
Neighbouring areas
- Structural engineering for two-storey extensions in Nottinghamshire
- Structural engineering for two-storey extensions in Rutland
- Structural engineering for two-storey extensions in East Riding of Yorkshire
- Structural engineering for two-storey extensions in South Yorkshire
All extension services in Lincolnshire · About structural engineering for two-storey extensions
Ready to see what a second storey could do for your home?
Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.