Two-storey extension plans and drawings in Aberdeen and Aberdeenshire
We handle extension plans and drawings for homeowners across Aberdeen and Aberdeenshire, from the first visit to the final paperwork.
Aberdeen and Aberdeenshire at a glance
- Nation
- Scotland
- Price region
- Scotland
- Postcode areas
- AB, DD
- Towns covered
- 13 listed below, plus surrounding villages
- Site visits
- Free, no obligation
What a set of extension plans involves
This service suits you if you want clear, accurate plans for a two-storey extension, whether to apply for planning, check permitted development or get build prices. You get a measured survey, sketch options with guide costs, a chosen design developed into planning drawings and, if you go ahead, building warrant drawings coordinated with the structural engineer. Because we also build, the drawings are prepared with the build in mind.
The main places we list in Aberdeen and Aberdeenshire are Aberdeen (AB10), Peterhead (AB42), Nigg (AB12), Inverurie (AB51), Fraserburgh (AB43) and Westhill (Aberdeen and Aberdeenshire) (AB13). We cover the villages in between too.
Fees
Planning drawings (survey and design) are a guide of £2,000–£3,500 and building warrant drawings and specification £1,500–£4,000, with your design stage priced in writing before it starts.
Rules in Scotland
In Scotland, the plans support a householder application, costing £371, and later a building warrant application with technical drawings to the Scottish Building Standards Technical Handbooks. Because Class 1B needs 10 m to every boundary, the site plan showing boundary distances is often what decides the route.
Approval in Scotland: Householder planning application: £371. Councils have two months to decide a local planning application.
Building standards: A building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks.
There is no Party Wall Act in Scotland. Shared walls and boundaries are governed by title deeds and common law, so we speak to neighbours early and record the condition of shared structures.
Getting the design right
Start with a measured survey
Accurate drawings depend on accurate measurements of the house, the boundaries and neighbouring windows. We measure inside and out, note levels, drains and trees, and record the original house so permitted development limits can be checked against the right starting point.
Planning drawings versus building warrant drawings
Planning drawings show what the extension looks like and how it affects neighbours. Building warrant drawings show how it is built: foundations, structure, insulation, fire safety, ventilation and drainage. Most two-storey extensions need both, prepared at different stages.
How we work in Aberdeen and Aberdeenshire
Look at the house
We start in Aberdeen and Aberdeenshire with a free visit: measurements, photos, a look at the loft and drains, and a frank chat about budget.
Drawings, then consent
We draw the scheme, check it against the rules in Scotland, and take it through the right consent with the council.
Structure and building standards
A structural engineer sizes the foundations and steels, and we get a building warrant before work starts.
On site
One project lead runs the job, keeps you updated and arranges inspections at each stage until completion.
Towns we cover in Aberdeen and Aberdeenshire
- Aberdeen
- Peterhead
- Nigg
- Inverurie
- Fraserburgh
- Westhill (Aberdeen and Aberdeenshire)
- Montrose
- Stonehaven
- Ellon
- Portlethen
- Banchory
- Cove
- Dyce
Two-storey extension plans and drawings in Aberdeen and Aberdeenshire: questions
Do the plans include structural calculations?
Not at planning stage. Structural calculations and beam design are prepared by a structural engineer once the design is agreed, and they form part of the building standards package. We coordinate the engineer's work with the drawings so steel sizes and floor depths match.
How long do extension plans take to prepare?
Survey, design and planning drawings usually take 4 to 8 weeks, depending on how many options you want to explore. Technical design, structural calculations and a building warrant take a further 4 to 8 weeks, and this can overlap with the planning decision period.
Do I own the plans once they are drawn?
You receive copies of the drawings to use for your project, including your planning application and a building warrant. Copyright in drawings normally stays with whoever prepares them unless agreed otherwise. Your written design stage price sets out how the drawings can be used.
Neighbouring areas
- Two-storey extension plans and drawings in Dundee and Angus
- Two-storey extension plans and drawings in Perth and Kinross
- Two-storey extension plans and drawings in the Highlands, Moray and Islands
- Two-storey extension plans and drawings in Fife
All extension services in Aberdeen and Aberdeenshire · About two-storey extension plans and drawings
Ready to see what a second storey could do for your home?
Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.