Two-storey extension plans and drawings in Dundee and Angus
Planning an extension in Dundee and Angus? This is how our plans and drawings service works, with the Scotland rules and typical fees.
Dundee and Angus at a glance
- Nation
- Scotland
- Price region
- Scotland
- Postcode areas
- DD
- Towns covered
- 8 listed below, plus surrounding villages
- Site visits
- Free, no obligation
What a set of extension plans involves
Two-storey extension plans involve a measured survey of your house, design options, and a set of scaled drawings showing the existing and proposed floor plans, elevations, a site plan and a location plan. Building warrant drawings with construction details follow as a separate, more technical set.
Across Dundee and Angus we cover Dundee (DD1), Arbroath (DD11), Forfar (DD8), Carnoustie (DD7), Monifieth (DD5) and Brechin (DD9), plus the smaller places around them.
Fees
Planning drawings (survey and design) are a guide of £2,000–£3,500 and building warrant drawings and specification £1,500–£4,000, with your design stage priced in writing before it starts.
Rules in Scotland
In Scotland, the plans support a householder application, costing £371, and later a building warrant application with technical drawings to the Scottish Building Standards Technical Handbooks. Because Class 1B needs 10 m to every boundary, the site plan showing boundary distances is often what decides the route.
Approval in Scotland: Householder planning application: £371. Councils have two months to decide a local planning application.
Building standards: A building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks.
There is no Party Wall Act in Scotland. Shared walls and boundaries are governed by title deeds and common law, so we speak to neighbours early and record the condition of shared structures.
Getting the design right
Drawings that can be built
Drawings that ignore steel sizes, floor depths or drain runs often need redesigning once a builder prices them. We coordinate the design with the structural engineer and our build teams, so what is approved is practical to construct.
Compare options early
Sketching two or three layouts, such as rear, side or part two-storey, is the cheapest point to make big decisions. Each option comes with a guide cost and a view on the approval route, so you choose with the full picture rather than discovering limits later.
How we work in Dundee and Angus
Measure and listen
A visit to Dundee and Angus to understand how you live in the house now and what the extra rooms need to do, plus a first look at the structure.
Drawings and permission
Our designers produce plans and elevations, then we take care of planning or permitted development checks with the council covering Dundee and Angus.
Engineer it
Foundations sized for two floors, steels for any openings, and a building warrant, all before anyone starts on site.
Build and sign-off
Vetted teams working under S&K build the extension, and we arrange the completion certificate at the end.
Towns we cover in Dundee and Angus
Two-storey extension plans and drawings in Dundee and Angus: questions
Do the plans include structural calculations?
Not at planning stage. Structural calculations and beam design are prepared by a structural engineer once the design is agreed, and they form part of the building standards package. We coordinate the engineer's work with the drawings so steel sizes and floor depths match.
Do I own the plans once they are drawn?
You receive copies of the drawings to use for your project, including your planning application and a building warrant. Copyright in drawings normally stays with whoever prepares them unless agreed otherwise. Your written design stage price sets out how the drawings can be used.
How long do extension plans take to prepare?
Survey, design and planning drawings usually take 4 to 8 weeks, depending on how many options you want to explore. Technical design, structural calculations and a building warrant take a further 4 to 8 weeks, and this can overlap with the planning decision period.
Neighbouring areas
- Two-storey extension plans and drawings in Perth and Kinross
- Two-storey extension plans and drawings in Fife
- Two-storey extension plans and drawings in Edinburgh and the Lothians
- Two-storey extension plans and drawings in Aberdeen and Aberdeenshire
All extension services in Dundee and Angus · About two-storey extension plans and drawings
Ready to see what a second storey could do for your home?
Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.