Two-storey extension plans and drawings in Perth and Kinross
Our plans and drawings service covers the whole of Perth and Kinross. Choose your town below, or get in touch to talk your project through.
Perth and Kinross at a glance
- Nation
- Scotland
- Price region
- Scotland
- Postcode areas
- KY, PH
- Towns covered
- 8 listed below, plus surrounding villages
- Site visits
- Free, no obligation
What a set of extension plans involves
Two-storey extension plans involve a measured survey of your house, design options, and a set of scaled drawings showing the existing and proposed floor plans, elevations, a site plan and a location plan. Building warrant drawings with construction details follow as a separate, more technical set.
Towns in Perth and Kinross include Perth (PH1), Blairgowrie and Rattray (PH10), Crieff (PH5), Auchterarder (PH3), Scone (PH2) and Kinross (KY13). If yours isn't listed, we still cover it.
Fees
Planning drawings (survey and design) are a guide of £2,000–£3,500 and building warrant drawings and specification £1,500–£4,000, with your design stage priced in writing before it starts.
Rules in Scotland
In Scotland, the plans support a householder application, costing £371, and later a building warrant application with technical drawings to the Scottish Building Standards Technical Handbooks. Because Class 1B needs 10 m to every boundary, the site plan showing boundary distances is often what decides the route.
Approval in Scotland: Householder planning application: £371. Councils have two months to decide a local planning application.
Building standards: A building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks.
There is no Party Wall Act in Scotland. Shared walls and boundaries are governed by title deeds and common law, so we speak to neighbours early and record the condition of shared structures.
Getting the design right
Drawings that can be built
Drawings that ignore steel sizes, floor depths or drain runs often need redesigning once a builder prices them. We coordinate the design with the structural engineer and our build teams, so what is approved is practical to construct.
Planning drawings versus building warrant drawings
Planning drawings show what the extension looks like and how it affects neighbours. Building warrant drawings show how it is built: foundations, structure, insulation, fire safety, ventilation and drainage. Most two-storey extensions need both, prepared at different stages.
How we work in Perth and Kinross
Understand the brief
At your home in Perth and Kinross we agree what you need: bedroom count, bathroom, kitchen space, and how much garden you want to keep.
Drawings and permission
Our designers produce plans and elevations, then we take care of planning or permitted development checks with the council covering Perth and Kinross.
Engineer it
Foundations sized for two floors, steels for any openings, and a building warrant, all before anyone starts on site.
Build and sign-off
Vetted teams working under S&K build the extension, and we arrange the completion certificate at the end.
Towns we cover in Perth and Kinross
Two-storey extension plans and drawings in Perth and Kinross: questions
Do I own the plans once they are drawn?
You receive copies of the drawings to use for your project, including your planning application and a building warrant. Copyright in drawings normally stays with whoever prepares them unless agreed otherwise. Your written design stage price sets out how the drawings can be used.
Do the plans include structural calculations?
Not at planning stage. Structural calculations and beam design are prepared by a structural engineer once the design is agreed, and they form part of the building standards package. We coordinate the engineer's work with the drawings so steel sizes and floor depths match.
How long do extension plans take to prepare?
Survey, design and planning drawings usually take 4 to 8 weeks, depending on how many options you want to explore. Technical design, structural calculations and a building warrant take a further 4 to 8 weeks, and this can overlap with the planning decision period.
Neighbouring areas
- Two-storey extension plans and drawings in Fife
- Two-storey extension plans and drawings in Falkirk, Stirling and Clackmannanshire
- Two-storey extension plans and drawings in Dundee and Angus
- Two-storey extension plans and drawings in Edinburgh and the Lothians
All extension services in Perth and Kinross · About two-storey extension plans and drawings
Ready to see what a second storey could do for your home?
Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.