Building regulations for two-storey extensions in Gloucestershire
Looking for help with building regulations approval in Gloucestershire? Here's what's involved, the rules in England and what it typically costs.
Gloucestershire at a glance
- Nation
- England
- Price region
- South West England
- Postcode areas
- BS, GL
- Towns covered
- 15 listed below, plus surrounding villages
- Site visits
- Free, no obligation
What a building regulations application involves
Building regulations approval for a two-storey extension involves preparing technical drawings and a specification that show how the extension meets the rules on structure, fire safety, insulation, ventilation, electrics and drainage, getting them approved and having the work inspected. At the end you receive a completion certificate.
Across Gloucestershire we cover Gloucester (GL1), Cheltenham (GL50), Stroud (GL5), Kingswood (BS15), Mangotsfield (BS16) and Yate (BS37), plus the smaller places around them.
Fees
Technical drawings and specification are a guide of £1,500–£4,000. The council's building control fee depends on the value of the work; we confirm every fee in writing before the design stage starts.
Rules in England
In England, building regulations approval comes from council building control or a registered building control approver, using the Approved Documents. Full plans are recommended for two-storey work. New editions of Approved Documents L and F take effect generally from 24 March 2027 and are not yet in force, so current projects follow the 2021 standards.
Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.
Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.
The Party Wall etc. Act 1996 applies, so notices may be needed for work on or near a shared wall or boundary.
Getting the design right
Full plans and inspections
Full plans approval checks the design before work starts, which we recommend for two-storey extensions. Building control then inspects key stages, such as foundations, damp-proofing, drainage and insulation, before issuing the completion certificate.
Insulation and U-values
In England, Part L sets limiting U-values for extensions: 0.18 W/m²K for walls, 0.15 for roofs, 0.18 for floors and 1.4 for windows. Glazing is normally limited to 25% of the new floor area plus windows removed, unless SAP or compensating calculations are used.
How we work in Gloucestershire
Start at your house
We come to your home in Gloucestershire, measure up, check the ground floor walls and roof structure, and note anything near the boundaries.
Drawings and permission
Our designers produce plans and elevations, then we take care of planning or permitted development checks with the council covering Gloucestershire.
Detail and price
Construction drawings, engineer's calculations and building control sign-off, then a written fixed price for the build.
On site
One project lead runs the job, keeps you updated and arranges inspections at each stage until completion.
Towns we cover in Gloucestershire
- Gloucester
- Cheltenham
- Stroud
- Kingswood
- Mangotsfield
- Yate
- Tewkesbury
- Cirencester
- Dursley
- Bishops Cleeve
- Stoke Gifford
- Churchdown
- Cinderford
- Charlton Kings
- Thornbury
Building regulations for two-storey extensions in Gloucestershire: questions
Do I need building regulations if I have planning permission?
Yes. Planning permission and building regulations are separate. Planning covers what the extension looks like and how it affects neighbours; building regulations cover how it is built and whether it is safe, warm and healthy. A two-storey extension needs both, unless permitted development replaces the planning part.
Are the new 2027 building regulations going to affect my extension?
New editions of Approved Documents L and F take effect generally from 24 March 2027 in England, and are not in force yet. Projects approved under the current rules follow the 2021 standards. If your build will start after that date, we check whether transitional arrangements apply.
What is a build-over agreement?
A build-over agreement is permission from your water company to build over or near a public sewer. Many rear extensions sit near shared drains, and the water company will want access protected and the pipe checked. We check sewer records early so the agreement does not delay the start.
Neighbouring areas
- Building regulations for two-storey extensions in Bristol
- Building regulations for two-storey extensions in Wiltshire
- Building regulations for two-storey extensions in Herefordshire
- Building regulations for two-storey extensions in Gwent
All extension services in Gloucestershire · About building regulations for two-storey extensions
Ready to see what a second storey could do for your home?
Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.