Greater London · England

Design and build two-storey extensions in Greater London

Looking for help with a design and build project in Greater London? Here's what's involved, the rules in England and what it typically costs.

Greater London at a glance

Nation
England
Price region
London
Postcode areas
BR, CR, DA, E, EC, EN, HA, IG, KT, N, NW, RM, SE, SM, SW, TN, TW, UB, W, WC
Towns covered
215 listed below, plus surrounding villages
Site visits
Free, no obligation

What a design and build project involves

This service suits you if you want one team accountable from the first visit to the completion certificate. We manage the design, approvals and build, and the work is carried out by vetted teams working under S&K. Because the same team designs and builds, costs are checked as the design develops. Every project starts with a free site visit.

Greater London towns we list: Brent (HA0), Islington (EC1V), Westminster (SW1), Bexley (DA5), Barking (E6) and Archway (N6). Every other address in Greater London is covered as well.

Fees

The design stage is priced in writing before it starts, and the build is a fixed price in writing once the design is agreed.

Rules in England

In England, design and build covers the permitted development check or planning application (£548 (or £575 for applications made from 8 December 2026)), building regulations approval from council building control or a registered approver, Party Wall Act notices where needed, and the Building Safety Act dutyholder roles. We programme them so they overlap where possible.

Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.

Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.

The Party Wall etc. Act 1996 applies, so notices may be needed for work on or near a shared wall or boundary.

Getting the design right

Responsibility for the rules

In England, where more than one contractor is involved, a principal designer and principal contractor must be appointed. On design and build projects we take on these duties, so you are not left holding responsibilities you may not know you had.

Cost checking as you design

Because the people drawing the extension also build it, each design option comes with a guide cost. That avoids the common problem of an approved design that turns out to be too expensive once builders price it.

How we work in Greater London

  1. Free site visit

    We visit your home in Greater London, look at the structure, access and boundaries, and talk through what you want the new rooms to do.

  2. Get it approved

    Once you're happy with the design we submit it to the council for Greater London and deal with any questions from the planning officer.

  3. Technical design

    We prepare the building regulations drawings, structural calculations and specification so the build price can be fixed.

  4. Finish and certify

    Second fix, plastering and making good, then building control's final inspection and the completion paperwork.

Towns we cover in Greater London

Design and build two-storey extensions in Greater London: questions

When is the build price fixed?

Once the design is agreed and the drawings, structural calculations and specification are complete. Before that we give guide costs at each stage. The fixed price is set out in writing before work starts, and any changes you ask for after that are priced separately before they are made.

What is the difference between design and build and using an architect?

With an architect, you appoint them for the design and approvals, then find and manage a builder separately. With design and build, one team does both, so cost, buildability and approvals are considered together and there is one point of contact. Some people still prefer to hire an architect separately.

Do I have to use you for the build if I pay for the design stage?

No. The design stage is priced separately, so you can take the approved drawings to other builders if you choose. Most people who use design and build carry on to the build, because the design has been costed as it developed.

Neighbouring areas

All extension services in Greater London · About design and build two-storey extensions

Ready to see what a second storey could do for your home?

Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.

CallGuide price