What a structural design involves

This service suits every two-storey extension, because each one needs foundations sized for two storeys and usually steel beams where walls are removed. You get a structural engineer's calculations and drawings for beams, padstones, lintels, foundations and connections, coordinated with the architectural drawings, submitted for building control and followed through on site by our build teams.

Towns in Cumbria include Carlisle (CA3), Barrow-in-Furness (LA13), Kendal (LA8), Whitehaven (CA28), Workington (CA14) and Penrith (CA10). If yours isn't listed, we still cover it.

Fees

A structural engineer (calculations and beam design) is a guide of £750–£2,200, priced in writing once the design is known.

Rules in England

In England, structural engineering is part of building regulations approval under Part A rather than planning. The engineer's calculations go to council building control or a registered building control approver with the full plans application. Where more than one contractor is involved, the Building Safety Act dutyholder rules also apply.

Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.

Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.

The Party Wall etc. Act 1996 applies, so notices may be needed for work on or near a shared wall or boundary.

Getting the design right

Tying into the house

The new walls and floors are tied into the existing house with wall ties, restraint straps and joist hangers. The engineer also considers movement between the old and new foundations and where a movement joint may be needed.

Building on existing structure

When building over a garage or a single-storey extension, the engineer checks the existing footings, walls and lintels. Many were sized for one storey only and need underpinning, strengthening or replacement to carry the new floor.

How we work in Cumbria

  1. Measure and listen

    A visit to Cumbria to understand how you live in the house now and what the extra rooms need to do, plus a first look at the structure.

  2. Get it approved

    Once you're happy with the design we submit it to the council for Cumbria and deal with any questions from the planning officer.

  3. Engineer it

    Foundations sized for two floors, steels for any openings, and building control approval, all before anyone starts on site.

  4. Build it

    The new structure goes up first, then we open into the house, finish inside and get the completion certificate.

Towns we cover in Cumbria

Structural engineering for two-storey extensions in Cumbria: questions

Can a steel beam be hidden in the ceiling?

Often, yes. A beam can sit within the floor depth so the ceiling is flat, but that may mean a deeper steel section or a different floor structure. Otherwise it shows as a downstand below the ceiling. We discuss the options with you and the engineer before the design is fixed.

What are trial holes and why do I need them?

Trial holes are small excavations dug next to the house or garage to see the depth and condition of the existing foundations and the soil. They tell the engineer whether existing footings can be reused and how deep the new ones need to go, which avoids surprises during the build.

How deep do foundations need to be for a two-storey extension?

There is no single depth. It depends on the soil, nearby trees, drains and the loads. On firm ground foundations may be around a metre deep, while clay near trees can need much deeper trench fill or piles. Trial holes and the engineer's design set the depth, and building control inspects the trenches.

Neighbouring areas

All extension services in Cumbria · About structural engineering for two-storey extensions

Ready to see what a second storey could do for your home?

Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.

CallGuide price