What a structural design involves

This service suits every two-storey extension, because each one needs foundations sized for two storeys and usually steel beams where walls are removed. You get a structural engineer's calculations and drawings for beams, padstones, lintels, foundations and connections, coordinated with the architectural drawings, submitted for building control and followed through on site by our build teams.

Towns in Tyne and Wear include Newcastle upon Tyne (NE1), Sunderland (SR1), South Shields (NE33), Gateshead (NE8), Washington (NE37) and Tynemouth (NE30). If yours isn't listed, we still cover it.

Fees

A structural engineer (calculations and beam design) is a guide of £750–£2,200, priced in writing once the design is known.

Rules in England

In England, structural engineering is part of building regulations approval under Part A rather than planning. The engineer's calculations go to council building control or a registered building control approver with the full plans application. Where more than one contractor is involved, the Building Safety Act dutyholder rules also apply.

Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.

Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.

The Party Wall etc. Act 1996 applies, so notices may be needed for work on or near a shared wall or boundary.

Getting the design right

Building on existing structure

When building over a garage or a single-storey extension, the engineer checks the existing footings, walls and lintels. Many were sized for one storey only and need underpinning, strengthening or replacement to carry the new floor.

Foundations for two storeys

Two storeys put more load on the ground than one, so foundations are usually deeper or wider. Clay soil, nearby trees, drains and made-up ground can all mean deeper trench fill or piles, which is why we dig trial holes before fixing the design.

How we work in Tyne and Wear

  1. Start at your house

    We come to your home in Tyne and Wear, measure up, check the ground floor walls and roof structure, and note anything near the boundaries.

  2. Get it approved

    Once you're happy with the design we submit it to the council for Tyne and Wear and deal with any questions from the planning officer.

  3. Structure and building control

    A structural engineer sizes the foundations and steels, and we get building regulations approval before work starts.

  4. Build it

    The new structure goes up first, then we open into the house, finish inside and get the completion certificate.

Towns we cover in Tyne and Wear

Structural engineering for two-storey extensions in Tyne and Wear: questions

Will the engineer visit the site during the build?

Not usually at every stage. Building control inspects the foundations, steelwork and other key stages against the approved calculations. The engineer is called back if site conditions differ from the design, such as unexpected ground, hidden beams or weak existing walls, and issues revised details before that part of the work continues.

Do I need a structural engineer for a two-storey extension?

Almost always. Building control needs calculations showing that the foundations, beams and walls can carry the loads of two storeys and a roof. A two-storey extension usually involves removing part of an outside wall and new steel, which needs an engineer's design.

How deep do foundations need to be for a two-storey extension?

There is no single depth. It depends on the soil, nearby trees, drains and the loads. On firm ground foundations may be around a metre deep, while clay near trees can need much deeper trench fill or piles. Trial holes and the engineer's design set the depth, and building control inspects the trenches.

Neighbouring areas

All extension services in Tyne and Wear · About structural engineering for two-storey extensions

Ready to see what a second storey could do for your home?

Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.

CallGuide price