Two-storey wraparound extensions in Bridgwater
Want to stay in Bridgwater but need more space? A two-storey wraparound extension adds floor area on two levels without giving up much garden. Here's what's involved.
Quick reference for homeowners in Bridgwater.
- Postcode districts
- TA5, TA6 and TA7
- County / area
- Somerset, England
- Price region
- South West England
- Guide price
- £124,000–£170,000 (£2,210–£3,040 per m²)
- Approval route
- Planning permission is needed: the side part takes it outside permitted development in England.
- Nearest towns
- Burnham-on-Sea (7.6 miles), Taunton (8.9 miles), Street (11.4 miles)
- Distance to Bath
- about 32.6 miles
- First visit
- Free, no obligation
About a two-storey wraparound extension
A two-storey wraparound extension is an L-shaped addition that extends both the side and the rear of your house, on two floors. It gives one of the largest gains in floor space of any extension, typically a big open-plan kitchen and living area below and two or more bedrooms or bathrooms above. In England it needs planning permission, because the side part is more than one storey.
We cover Bridgwater (TA5, TA6 and TA7) and the places around it, including Burnham-on-Sea (7.6 miles), Taunton (8.9 miles) and Street.
What it costs in Bridgwater
Expect a two-storey wraparound extension in Bridgwater to land somewhere around £124,000–£170,000 for an L-shaped footprint of about 28 m² wrapping the side and rear, on two floors (56 m² of new floor space). Our South West England guide rate is £2,210–£3,040 per m², including VAT. Professional fees for drawings and the structural engineer are listed separately on our prices page.
| Spec | Per m² | An L-shaped footprint of about 28 m² wrapping the side and rear, on two floors (56 m² of new floor space) |
|---|---|---|
| Essential | £2,040–£2,800 per m² | £114,000–£156,500 |
| Standard | £2,210–£3,040 per m² | £124,000–£170,000 |
| Premium | £2,660–£3,650 per m² | £149,000–£204,000 |
Planning and building regulations in Bridgwater
In England, a two-storey wraparound extension needs householder planning permission, because any extension beyond a side wall must be single storey to be permitted development. The application costs £548 (or £575 for applications made from 8 December 2026). Councils weigh the side part against the street scene and the rear part against neighbours' light and outlook, and should decide within 8 weeks of validation.
Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.
Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.
Design points for Bridgwater homes
Phasing the build
A wraparound touches two sides of the house at once, so the kitchen and often the rear rooms are out of use for part of the build. We plan the sequence so you keep a working kitchen and bathroom for as long as possible, or advise when moving out briefly makes sense.
Two roofs that meet
A wraparound needs the side roof and rear roof to join cleanly, often with a valley or hip where they meet. Getting pitches and ridge heights right keeps rainwater moving and avoids a bulky mass at the back corner, which neighbours and planners notice.
How we'd run your project
Understand the brief
At your home in Bridgwater we agree what you need: bedroom count, bathroom, kitchen space, and how much garden you want to keep.
Drawings and permission
Our designers produce plans and elevations, then we take care of planning or permitted development checks with the council covering Bridgwater.
Fixed price in writing
With approved drawings and calculations, we give you a fixed build price and a programme you can plan around.
Build and hand over
We manage the build from groundworks to decoration-ready finish and hand over with the completion paperwork.
Questions about two-storey wraparound extensions in Bridgwater
How long does a two-storey wraparound extension take?
Allow 4 to 8 weeks for survey and design, then the approval period (councils should decide householder applications within 8 weeks of validation), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.
Who handles building regulations for a project in Bridgwater?
We handle it as part of the project. What's needed in England: building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.
Which postcodes do you cover around Bridgwater?
We cover Bridgwater (TA5, TA6 and TA7) and nearby places including Burnham-on-Sea, Taunton and Street, plus the rest of Somerset. The first site visit is free.
Can I stay at home during a wraparound extension?
Many people do, but a wraparound affects two sides of the house and usually the kitchen, so there will be weeks without a full kitchen. We plan a temporary kitchen, keep a route through the house and seal off the work area. For some families, moving out while the rear wall is opened up is easier.
Is a wraparound extension better than separate side and rear extensions?
Building both at once usually costs less than two separate projects, because you pay for one set-up, one scaffold, one roof junction and one set of approvals. It also lets the layout be designed as a whole. The trade-off is a larger single outlay and a longer build, often 16 to 24 weeks at this size.
Nearby
We also cover places near Bridgwater, including:
Other extensions in Bridgwater
- Rear
- Side
- Part two-storey
- Over a garage
- First floor
- Semi-detached
- Detached
- Kitchen and bedrooms
- Bedroom and en-suite
All two-storey extension services in Bridgwater · Two-storey wraparound extensions across Somerset
Send us your postcode and a few details. We'll get back to you to arrange a visit and talk through your options.