Leicestershire · England

Planning permission for two-storey extensions in Leicestershire

Planning an extension in Leicestershire? This is how our planning application service works, with the England rules and typical fees.

Leicestershire at a glance

Nation
England
Price region
East Midlands
Postcode areas
CV, LE
Towns covered
23 listed below, plus surrounding villages
Site visits
Free, no obligation

What a planning application involves

Getting planning permission for a two-storey extension involves checking whether permitted development applies, preparing drawings and supporting information, submitting a householder application to the council and dealing with questions until a decision is made. Many two-storey extensions need permission, especially side, wraparound and front ones.

Towns in Leicestershire include Leicester (LE1), Loughborough (LE11), Hinckley (LE10), Coalville (LE67), Wigston Magna (LE8) and Melton Mowbray (LE13). If yours isn't listed, we still cover it.

Fees

Planning drawings are a guide of £2,000–£3,500, priced in writing before the design stage starts. Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026).

Rules in England

In England, a householder planning application costs £548 (or £575 for applications made from 8 December 2026), and councils should decide within 8 weeks of validation. Two-storey side, wraparound and front extensions always need permission. Rear extensions may be permitted development within the 3 m and 7 m limits, confirmed with a lawful development certificate costing £274 (about £288 for applications from 8 December 2026).

Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.

Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.

The Party Wall etc. Act 1996 applies, so notices may be needed for work on or near a shared wall or boundary.

Getting the design right

Neighbours' light and privacy

The main concerns on a two-storey extension are usually loss of light, outlook and privacy for neighbours. We test the design against nearby windows and gardens, and adjust depth, roof shape or window positions before submitting.

A complete application

Applications that are missing drawings, the right fee or a certificate of ownership are not validated, and the decision clock does not start. We check the council's validation list so the application is complete on day one.

How we work in Leicestershire

  1. Start at your house

    We come to your home in Leicestershire, measure up, check the ground floor walls and roof structure, and note anything near the boundaries.

  2. Plans, then approval

    Measured survey, design, then the right approval route for your house. We explain each step before we take it.

  3. Engineer it

    Foundations sized for two floors, steels for any openings, and building control approval, all before anyone starts on site.

  4. On site

    One project lead runs the job, keeps you updated and arranges inspections at each stage until completion.

Towns we cover in Leicestershire

Planning permission for two-storey extensions in Leicestershire: questions

Should I get pre-application advice from the council?

It can help on sensitive sites, such as conservation areas, corner plots or front extensions, where the council's view is hard to predict. Many councils charge for it and response times vary. For straightforward designs that follow local guidance, a well prepared application is often the quicker route.

What happens if my planning application is refused?

You can change the design and apply again, or appeal. In England, a householder appeal must usually be made within 12 weeks of the decision. Often the best route is a revised design that answers the reasons for refusal. We read the officer's report and advise which option has the better chance.

Neighbouring areas

All extension services in Leicestershire · About planning permission for two-storey extensions

Ready to see what a second storey could do for your home?

Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.

CallGuide price