Leicestershire · England

Two-storey extension plans and drawings in Leicestershire

Looking for help with extension plans and drawings in Leicestershire? Here's what's involved, the rules in England and what it typically costs.

Leicestershire at a glance

Nation
England
Price region
East Midlands
Postcode areas
CV, LE
Towns covered
23 listed below, plus surrounding villages
Site visits
Free, no obligation

What a set of extension plans involves

Two-storey extension plans involve a measured survey of your house, design options, and a set of scaled drawings showing the existing and proposed floor plans, elevations, a site plan and a location plan. These are the drawings needed for a planning application or lawful development certificate. Building regulations drawings with construction details follow as a separate, more technical set.

Towns in Leicestershire include Leicester (LE1), Loughborough (LE11), Hinckley (LE10), Coalville (LE67), Wigston Magna (LE8) and Melton Mowbray (LE13). If yours isn't listed, we still cover it.

Fees

Planning drawings (survey and design) are a guide of £2,000–£3,500 and building regulations drawings and specification £1,500–£4,000, with your design stage priced in writing before it starts.

Rules in England

In England, the plans support either a householder application, costing £548 (or £575 for applications made from 8 December 2026), or a lawful development certificate for permitted development, costing £274 (about £288 for applications from 8 December 2026). They must show the extension's relationship to the original house, the boundaries and neighbours, because two-storey rear permitted development depends on the 3 m and 7 m limits.

Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.

Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.

The Party Wall etc. Act 1996 applies, so notices may be needed for work on or near a shared wall or boundary.

Getting the design right

Compare options early

Sketching two or three layouts, such as rear, side or part two-storey, is the cheapest point to make big decisions. Each option comes with a guide cost and a view on the approval route, so you choose with the full picture rather than discovering limits later.

Start with a measured survey

Accurate drawings depend on accurate measurements of the house, the boundaries and neighbouring windows. We measure inside and out, note levels, drains and trees, and record the original house so permitted development limits can be checked against the right starting point.

How we work in Leicestershire

  1. Start at your house

    We come to your home in Leicestershire, measure up, check the ground floor walls and roof structure, and note anything near the boundaries.

  2. Drawings and permission

    Our designers produce plans and elevations, then we take care of planning or permitted development checks with the council covering Leicestershire.

  3. Detail and price

    Construction drawings, engineer's calculations and building control sign-off, then a written fixed price for the build.

  4. Build and sign-off

    Vetted teams working under S&K build the extension, and we arrange the building control completion certificate at the end.

Towns we cover in Leicestershire

Two-storey extension plans and drawings in Leicestershire: questions

Do the plans include structural calculations?

Not at planning stage. Structural calculations and beam design are prepared by a structural engineer once the design is agreed, and they form part of the building regulations package. We coordinate the engineer's work with the drawings so steel sizes and floor depths match.

How long do extension plans take to prepare?

Survey, design and planning drawings usually take 4 to 8 weeks, depending on how many options you want to explore. Technical design, structural calculations and building control approval take a further 4 to 8 weeks, and this can overlap with the planning decision period.

Can I use plans from a previous owner's planning permission?

Sometimes. If the permission is still valid, usually within three years of the decision in England, you can build to it. The drawings may still need updating for building regulations, and the design may not suit your needs. We check old plans and permissions at the free site visit.

Neighbouring areas

All extension services in Leicestershire · About two-storey extension plans and drawings

Ready to see what a second storey could do for your home?

Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.

CallGuide price